Policy and licensing / Czechia

Czechia: SÚJB Decree No. 378/2016 Coll. on siting of a nuclear installation

Czechia's siting decree, issued by the State Office for Nuclear Safety, sets which site characteristics must be assessed for a nuclear installation, the conditions that rule a site out, such as a capable fault or regular flooding, and the documents needed for a siting license. It names no site and approves no project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
final rule · Vyhláška č. 378/2016 Sb., o umístění jaderného zařízení, of 7 November 2016; in force 1 January 2017
Issued by
Státní úřad pro jadernou bezpečnost (SÚJB, State Office for Nuclear Safety)
Jurisdiction
Czechia
Affects
Siting
In effect from
1 Jan 2017
Expiry or completion
None recorded
Operative text
Czechia: SÚJB Decree No. 378/2016 Coll. on siting of a nuclear installation (working English translation) (SÚJB working English translation of the original 2016 text (PDF created 19 March 2017), not the authentic Czech text)
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Regulation of the State Office for Nuclear Safety issued under s. 236 of the Atomic Act to implement its ss. 24(7) and 47(4). It lists the site characteristics to be assessed for a nuclear installation (natural phenomena such as seismicity, faults, floods and groundwater, and phenomena originating in human activity such as aircraft crashes and explosions), sets the characteristics whose occurrence prohibits siting a nuclear installation, sets the scope and method of site evaluation, and sets the content of the documentation for a siting license (s. 1). Exclusion criteria include a seismically capable fault or other crustal movement within 5 km that could cause a safety-reducing deformation of the installation, or an associated fault on the site area (s. 6(2)) and regular flooding of the site area from extreme meteorological situations with a probability of once in 100 years or more (s. 7(2)). The decree names no site and grants no siting license. This record rests on the regulator's working English translation of the original text.

Not approved or still pending

Read in the regulator's working translation only, and the authentic Czech text on e-Sbírka could not be opened. Laws on accelerating energy infrastructure that may cover nuclear sources were not read. No site or siting license is recorded here. (Record checked .)

Dated lifecycle

Related instruments

Projects or designs named by the source

Sources