France: Basic nuclear installation (INB) regime, Code de l'environnement, livre V, titre IX
France licenses nuclear reactors as basic nuclear installations under the Environment Code. Creation is authorized by a Prime Minister's decree after a public inquiry and examination by the nuclear safety and radiation protection authority (ASNR), which then sets technical prescriptions and authorizes commissioning. It approves no reactor or project.
- Category
- Laws, rules and executive directives
- Status
- In effect
- Instrument
- statute · Code de l'environnement, livre V, titre IX, chapitres III, V et VI (articles L. 593-1 et suivants and the corresponding regulatory part), régime des installations nucléaires de base
- Issued by
- Parlement (legislative part) and Gouvernement (regulatory part), codified in the Code de l'environnement
- Jurisdiction
- France
- Affects
- National reactor licensing
- Effective date
- Not recorded
- Expiry or completion
- None recorded
- Operative text
- ASNR: Le régime juridique des installations nucléaires de base (ASNR explanatory page 'Le régime juridique des installations nucléaires de base', last updated 16 December 2025 (the Code text itself was not read))
- Record reviewed · next review
- 29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)
Legal and geographic scope
French legislative and regulatory regime for basic nuclear installations (INB), which include nuclear reactors. According to the Autorité de sûreté nucléaire et de radioprotection (ASNR), chapters III, V and VI of title IX of book V of the Environment Code found the authorization and control regime, renovated by Law 2006-686 of 13 June 2006 and codified in the Code. An intending operator may first ask the ASNR for an opinion on its safety options. The creation authorization application is filed with the minister responsible for nuclear safety and examined by the ASNR, and under article L. 593-8 the authorization can be granted only after a public inquiry. Creation is authorized by decree of the Prime Minister countersigned by the minister responsible for nuclear safety, after the ASNR's opinion, and the decree sets the installation's perimeter and characteristics. The ASNR then sets technical prescriptions and authorizes commissioning after checking the installation against chapter III. A building permit from the prefect and, for some new sites, a public debate also apply. The ASNR, formed from the ASN and IRSN, started on 1 January 2025. The regime does not itself authorize any reactor, design or project.
Not approved or still pending
Authorizes no installation. The Environment Code articles were not read in their own text because Legifrance refused automated access, so this record rests on the regulator's explanatory page. Amendments after 16 December 2025, including any made for small reactors, were not checked. (Record checked .)
Dated lifecycle
- 13 Jun 2006 · Enacted — Law 2006-686 of 13 June 2006 on transparency and security in nuclear matters renovated the INB regime, later codified in the Environment Code. (ASNR: Le régime juridique des installations nucléaires de base)
- 1 Jan 2025 · Milestone — The ASNR, created by the law of 21 May 2024 from the ASN and IRSN, started on 1 January 2025. (ASNR: Le régime juridique des installations nucléaires de base)
Related instruments
Projects or designs named by the source
- None. Location in this jurisdiction does not make a project eligible for, or approved under, this measure.
Sources
- ASNR: Le régime juridique des installations nucléaires de base (regulator, page updated 16 Dec 2025, accessed 29 Oct 2026)