Policy and licensing / France

France: Loi n° 2023-491 du 22 juin 2023 (accélération des procédures nucléaires près des sites existants)

France's 2023 nuclear acceleration law simplifies planning, environmental and land procedures for new power reactors, including small modular reactors, built next to or inside existing nuclear sites when the creation authorization is sought within twenty years. Buildings that will hold nuclear fuel still wait for the creation authorization. It approves no reactor or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
statute · Loi n° 2023-491 du 22 juin 2023 relative à l'accélération des procédures liées à la construction de nouvelles installations nucléaires à proximité de sites nucléaires existants et au fonctionnement des installations existantes (JO n° 144 du 23 juin 2023)
Issued by
Parlement
Jurisdiction
France
Affects
Siting, Environmental review
Effective date
Not recorded
Expiry or completion
None recorded
Operative text
Sénat: tableau historique du projet de loi pjl22-100, colonne « Texte promulgué » (Loi n° 2023-491 du 22 juin 2023) (Promulgated text ('Texte promulgué' column) in the Senate's historical comparative table for bill pjl22-100; not consolidated, later amendments not verified)
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

French statute whose title II speeds up procedures for building power reactors, including small modular reactors, sited in the immediate vicinity of or inside the perimeter of an existing basic nuclear installation, where the creation authorization application is filed within twenty years of promulgation (art. 7 II). The Conseil d'État decree under art. 18 defines immediate vicinity, which cannot exceed the initial perimeter of the existing installation's off-site emergency plan (art. 7 VI). For such reactors, general-interest project status is decided by Conseil d'État decree after the public debate or consultation (art. 8), works are exempt from planning formalities with conformity checked during the environmental or creation authorization (art. 9), and the environmental authorization is granted by decree and allows other works before the creation authorization, while buildings to receive nuclear fuel or house safeguard equipment wait for it (art. 11). Reactors meeting decree conditions are deemed of imperative overriding public interest (art. 12). Title I repeals Energy Code article L. 311-5-5 and point 5 of article L. 100-4 I and makes the creation authorization stand in for the electricity operating authorization (arts. 1-2). The Constitutional Council's decision 2023-851 DC of 21 June 2023 struck out several provisions before promulgation, including articles 3, 4 and 17, paragraph III of article 9 and provisions of articles 26, 27 and 29, which the Senate's table marks as declared non-conforming. The law sites, licenses or approves no reactor or project.

Not approved or still pending

Approves no project and fixes no immediate-vicinity perimeter for any site. The implementing Conseil d'État decree under art. 18, any order under art. 7 III, the decree conditions under art. 12 and amendments after promulgation were not read because Legifrance refused automated access. The content of the repealed Energy Code provisions was not read. (Record checked .)

Dated lifecycle

Definitions in this instrument

Related instruments

Projects or designs named by the source