Policy and licensing / Netherlands
Netherlands: SMR policy and licensing
Selected federal, state, territory, and national measures whose official text was opened. This is not a complete list of laws, rules, programs or guidance for any jurisdiction. A jurisdiction without a page here is not a finding that it has no policy, and these pages do not rate or prefer any jurisdiction. Nothing here implies that a project is eligible for, or approved under, any measure.
EU and Euratom measures also apply in Netherlands; see the EU page.
Where licensing stands
Built only from the records on this page. It is not a complete account of the law and not legal advice.
- Authorities named in recorded applications, reviews and decisions
- None recorded: no application or decision for a tracked project here is recorded.
- Licensing law or framework in the record
- Evidence read: Netherlands: Nuclear Energy Act (Kernenergiewet)
- Latest recorded step
- Awarded : Netherlands: MOOI subsidy module, nuclear energy innovation theme (Missiegedreven Onderzoek, Ontwikkeling en Innovatie)
- Open coverage gaps
- None open in the bounded review; a concluded review is not exhaustive. What the review of 29 Oct 2026 read.
Laws, rules and executive directives
- Netherlands: Environmental Quality Decree (Besluit kwaliteit leefomgeving), nuclear power plant locations · In effect
Besluit kwaliteit leefomgeving, Besluit van 3 juli 2018 (BWBR0041313), arts. 5.156 and 5.158 and Annex XV part B; consolidated version in force from 1 October 2026 · Government of the Netherlands (royal decree on the proposal of the Minister of Infrastructure and the Environment) · affects: Siting
The Netherlands' Environmental Quality Decree reserves two locations for a nuclear power plant, Borssele/Vlissingen and Maasvlakte I, in municipal environment plans. Within 1 km of them, plans may not allow housing that would push the population above 5,000 or other vulnerable buildings. It grants no permit and approves no reactor or project.
Not approved or pending: The ministerial regulation fixing the location boundaries was not opened. The project procedure for two new large plants had produced no location decision in the notices read. Future and undated amendments flagged by the portal were not assessed. (Record checked .) - Netherlands: Nuclear Energy Act (Kernenergiewet) · In effect
Kernenergiewet, Wet van 21 februari 1963 (BWBR0002402); consolidated version in force from 1 July 2024 · Staten-Generaal (Act of Parliament, Kingdom of the Netherlands) · affects: National reactor licensing
The Netherlands' Nuclear Energy Act prohibits building, commissioning, operating or modifying a nuclear reactor installation without a license from the independent Authority for Nuclear Safety and Radiation Protection (ANVS). A license can be refused only for listed interests, such as protecting people and security, or because the technology would be outdated. It approves no site, design or project.
Not approved or pending: Amendments the portal flags as having no in-force date were not assessed. The Decree on nuclear installations, fissile materials and ores (Bkse) and ANVS regulations were not opened. No license is recorded here. (Record checked .)
Bills, proposed rules and consultations
- None recorded.
Funding and support programs
- Netherlands: MOOI subsidy module, nuclear energy innovation theme (Missiegedreven Onderzoek, Ontwikkeling en Innovatie) · In effect
Regeling van de Minister van Klimaat en Groene Groei van 30 juni 2025, nr. WJZ/98809940 (Stcrt. 2025, 22357), amended by Stcrt. 2025, 43110 and Stcrt. 2026, 19339 · Minister van Klimaat en Groene Groei (Minister of Climate and Green Growth) · affects: Project funding
A Dutch subsidy module for mission-driven research and innovation added a nuclear energy theme in 2025 covering Generation IV reactors, small modular reactors of at least Generation III+ and microreactors, and geological waste disposal. Collaborations could apply from 5 January to 12 February 2026 for a budget later raised to EUR 12.6 million. It licenses or sites no reactor.
Not approved or pending: Individual award decisions, per-project amounts and the RVO decision documents were not opened; the four awards are recorded from the government's notice of 2 July 2026. The consolidated Regeling nationale EZ-, LVVN- en KGG-subsidies and any later opening were not opened. (Record checked .)
No award or selection recorded.
Regulatory guidance and inspector policies
- None recorded.
Recorded applications and decisions for tracked projects and designs in Netherlands
Project and design permissions are separate from the general measures above.
- None recorded.
What this review has read for Netherlands
As of 29 Oct 2026. Bounded review concluded. A bounded review of three national source classes, not a complete list of laws, rules or programs. Coverage for every reviewed country.
- Controlling reactor licensing framework: Evidence read. The consolidated Nuclear Energy Act on the government legislation portal (version in force from 1 July 2024) was read. Amendments that have no in-force date yet and the decree on nuclear installations, fissile materials and ores were not assessed.
- Siting restrictions or rules: Evidence read. The Environmental Quality Decree, which reserves two locations for a nuclear power plant, was read. Government notices of February 2024 and February 2026 on choosing locations for two new large plants through a project procedure were read as context. They contain no location decision.
- Directly relevant support measures: Evidence read. Three Government Gazette regulations of the climate minister that add and fund a nuclear energy theme, covering SMRs and microreactors, in the MOOI innovation subsidy were read. Awards and other national nuclear funding were not reviewed.
Sources read (2):
- wetten.overheid.nl/BWBR0002402/ · checked 29 Oct 2026
- zoek.officielebekendmakingen.nl/stcrt-2025-22357.html · checked 29 Oct 2026