Norway: Act on Atomic Energy Activities (LOV-1972-05-12-28, atomenergiloven)

Norway's Atomic Energy Act requires a license from the King to build, own or operate a nuclear installation, tied to a specific site. A license to build a nuclear power plant should not be granted before the Storting has consented. The Norwegian Radiation and Nuclear Safety Authority prepares recommendations on all applications and must approve start of operation. It approves no site, design or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
statute · Lov 12. mai 1972 nr. 28 om atomenergivirksomhet (atomenergiloven), LOV-1972-05-12-28; in force 1 July 1973 (ss. 40-41 from 4 December 1974); last amended by LOV-2018-06-22-76 (from 1 January 2026) and LOV-2022-06-17-59
Issued by
Stortinget
Jurisdiction
Norway
Affects
National reactor licensing, Siting
In effect from
1 Jul 1973
Expiry or completion
None recorded
Operative text
Lovdata: Lov om atomenergivirksomhet [atomenergiloven] (LOV-1972-05-12-28), consolidated text (Consolidated text on Lovdata, last amended by LOV-2018-06-22-76 (from 1 January 2026) and LOV-2022-06-17-59)
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Norway's framework statute for nuclear installations. Section 4 provides that no one may build, own or operate a nuclear installation (atomanlegg) without a license (konsesjon) from the King, that the license applies to a specific operating site, and that a license to build a nuclear power plant should not be granted before the Storting has consented, with the case put to the Storting once a proposed site exists and ownership is clarified. Section 7 requires the applicant to give information on the site, purpose, type and scope and a safety assessment, and allows approval of a planned site to be promised before the license is final. Section 1 defines a nuclear reactor and a nuclear installation, which includes a reactor installation. Under section 10 the Norwegian Radiation and Nuclear Safety Authority (Direktoratet for strålevern og atomsikkerhet, DSA) is the highest technical body on safety, prepares recommendations on all license applications and supervises compliance, and section 11 requires DSA approval before an installation starts operating. Chapter III governs nuclear third-party liability. Lovdata names the Ministry of Health and Care Services as the responsible ministry. The Act sets no procedure specific to small modular reactors, and it does not itself license, site or approve any reactor, design or project.

Not approved or still pending

Grants no license and approves no site, design or project. The regulations made under the Act and any delegation decisions were not reviewed in full. The Storting members' proposal of 19 March 2026 asking for amendments to this Act is not law. (Record checked .)