Policy and licensing / Norway

Norway: Regulations on impact assessments (FOR-2017-06-21-854), Annex I item 2 b on nuclear reactors

Norway's impact assessment regulations require every nuclear power plant or other nuclear reactor, except research installations of up to 1 kW, to undergo an impact assessment with a notification and assessment program. Annex I names the Ministry of Energy as responsible authority for nuclear power plants under the Energy Act, alongside the radiation authority and two ministries under other laws. It sets no site and approves no project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
final rule · Forskrift 21. juni 2017 nr. 854 om konsekvensutredninger, FOR-2017-06-21-854; in force 1 July 2017; last amended by FOR-2026-03-06-353
Issued by
King in Council (Royal Decree), on the proposal of the Ministry of Local Government and Modernisation and the Ministry of Climate and Environment
Jurisdiction
Norway
Affects
Environmental review, Siting
In effect from
1 Jul 2017
Expiry or completion
None recorded
Operative text
Lovdata: Forskrift om konsekvensutredninger (FOR-2017-06-21-854), consolidated text (Consolidated text on Lovdata, last amended by FOR-2026-03-06-353)
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Norwegian regulations on impact assessments, issued by Royal Decree under the Planning and Building Act. Section 6 requires the plans and projects listed in Annex I always to undergo an impact assessment with a planning program or notification, including Annex I projects handled under laws other than the Planning and Building Act, and states that Annex I names the responsible authority. Annex I item 2 b covers nuclear power plants and other nuclear reactors, including their decommissioning, except research installations whose maximum power does not exceed 1 kW continuous load. For that item Annex I lists the Ministry of Energy for nuclear power plants under the Energy Act, and the Norwegian Radiation and Nuclear Safety Authority, the Ministry of Climate and Environment and the Ministry of Health and Care Services under the Atomic Energy Act and the Pollution Control Act. The regulations set the assessment procedure that precedes siting and licensing decisions. They do not decide where a reactor may be built, grant any license or concession, or approve any assessment program, design or project.

Not approved or still pending

Sets no site and approves no assessment program, license or project. Impact assessment programs set for individual Norwegian proposals were not reviewed, and the date on which Annex I item 2 b took its current wording was not checked. (Record checked .)

Dated lifecycle

Related instruments

Projects or designs named by the source

Sources