Poland: Atomic Law (Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe)

Poland's Atomic Law requires a license to build, commission, operate or decommission a nuclear power plant or research reactor. The President of the National Atomic Energy Agency (PAA) issues the licenses, assesses the site report and can give advance opinions on a location or on planned technical solutions. A 2026 amendment adds a PAA license for preliminary construction works. It approves no site, design or project.

Category
Laws, rules and executive directives
Status
In effect
Instrument
statute · Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe (Dz.U. 2001 nr 3 poz. 18); consolidated text Dz.U. 2026 poz. 1; amended by Dz.U. 2026 poz. 1097
Issued by
Sejm Rzeczypospolitej Polskiej (Parliament of Poland)
Jurisdiction
Poland
Affects
National reactor licensing, Licensing review fees
In effect from
1 Jan 2002
Expiry or completion
None recorded
Operative text
Poland: Ustawa z dnia 29 listopada 2000 r. – Prawo atomowe, consolidated text (Dz.U. 2026 poz. 1) (Consolidated text announced by the Marshal of the Sejm on 7 November 2025 (Dz.U. 2026 poz. 1, published 2 January 2026), read with the amending Act of 3 July 2026 (Dz.U. 2026 poz. 1097))
Record reviewed · next review
29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Poland's framework statute on peaceful uses of atomic energy, nuclear safety and radiation protection. Art. 4 ust. 1 pkt 2 makes the construction, commissioning, operation or decommissioning of nuclear facilities subject to a license (zezwolenie), and art. 3 pkt 17 defines a nuclear facility to include a nuclear power plant and a research reactor. Under art. 5 ust. 3 the President of the National Atomic Energy Agency (Prezes Państwowej Agencji Atomistyki, PAA) issues these licenses, and art. 109 makes the President the central government authority for nuclear safety and radiation protection. Art. 35b requires the investor's site assessment and a site report that the President assesses in the construction license procedure, art. 36 requires the President's positive opinion before a zoning decision for a nuclear facility, and art. 36a offers an advance opinion on a planned location. Art. 39a sets decision periods (24 months for a construction license), art. 39 sets application fees for nuclear power plants (PLN 5,000,000 for construction) and art. 39b offers a general opinion on planned technical solutions before an application. The amending Act of 3 July 2026 (Dz.U. 2026 poz. 1097) adds art. 36l, a separate PAA license for preliminary construction works at a nuclear power facility. The Act does not license, site or approve any reactor, design or project.

Not approved or still pending

Grants no license or opinion to any project or design. Council of Ministers implementing regulations (for example on site assessment under art. 35b ust. 4) were not opened. The consolidated text predates the 2026 amendment, which was read separately, and changes after it were not checked. (Record checked .)