Policy and licensing / South Korea
South Korea: Act on Physical Protection and Radiological Emergency (원자력시설 등의 방호 및 방사능 방재 대책법), emergency planning zones
South Korea's radiological emergency law sets base emergency planning zones around each nuclear power reactor, 3 to 5 km for precautionary action and 20 to 30 km for urgent protective action planning, which the operator refines with the regional government and must have approved by the Nuclear Safety and Security Commission. It approves no site or project.
- Category
- Laws, rules and executive directives
- Status
- In effect
- Instrument
- statute · 원자력시설 등의 방호 및 방사능 방재 대책법 (Act on Physical Protection and Radiological Emergency), Act No. 6873 of 15 May 2003, as last amended by Act No. 20720 of 21 January 2025 (in force 1 January 2026)
- Issued by
- National Assembly of the Republic of Korea
- Jurisdiction
- South Korea
- Affects
- Siting
- Effective date
- Not recorded
- Expiry or completion
- None recorded
- Operative text
- Korea Legislation Research Institute: 원자력시설 등의 방호 및 방사능 방재 대책법 / Act on Physical Protection and Radiological Emergency (Korean-English parallel text) (KLRI Korean-English parallel text current to Act No. 20720 of 21 January 2025, which the national law portal lists as the version in force from 1 January 2026)
- Record reviewed · next review
- 29 Oct 2026 · 29 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)
Legal and geographic scope
Korean statute on physical protection of nuclear facilities and radiological emergency preparedness. Article 20-2, added on 21 May 2014, requires the Nuclear Safety and Security Commission to determine and announce, for each nuclear facility, a base area for its radiological emergency planning zone. For an electricity-generating reactor and related facilities the base area is a precautionary action zone of a 3 to 5 kilometer radius and an urgent protective action planning zone of a 20 to 30 kilometer radius from where the reactor is installed. The licensee sets the actual zone after consulting the competent Mayor or Do Governor, taking account of population distribution, road networks, topography and the effectiveness of emergency measures. It must obtain the Commission's approval to set, alter or cancel the zone and must reflect it in its radiological emergency plan. The Act does not prohibit or approve any site and does not license any reactor or project.
Not approved or still pending
Sets no zone for any site and approves no facility. The Enforcement Decree, the Commission's announced base areas and any special treatment of small reactors were not reviewed. The general power plant siting law (Electric Power Source Development Promotion Act) was read but has no nuclear-specific provision and is not recorded. (Record checked .)
Dated lifecycle
- 15 May 2003 · Enacted — Enacted as Act No. 6873 (신규제정 2003. 5. 15). (Korea Legislation Research Institute: 원자력시설 등의 방호 및 방사능 방재 대책법 / Act on Physical Protection and Radiological Emergency (Korean-English parallel text))
- 21 May 2014 · Amended — Article 20-2 on radiological emergency planning zones added. (Korea Legislation Research Institute: 원자력시설 등의 방호 및 방사능 방재 대책법 / Act on Physical Protection and Radiological Emergency (Korean-English parallel text))
- 1 Jan 2026 · Provision took effect — Current version, Act No. 20720 of 21 January 2025, in force 1 January 2026. (National Law Information Center: 원자력시설 등의 방호 및 방사능 방재 대책법 (current version record))
Related instruments
- South Korea: Nuclear Safety Act (원자력안전법) (related)
Projects or designs named by the source
- None. Location in this jurisdiction does not make a project eligible for, or approved under, this measure.
Sources
- Korea Legislation Research Institute: 원자력시설 등의 방호 및 방사능 방재 대책법 / Act on Physical Protection and Radiological Emergency (Korean-English parallel text) (government, accessed 29 Oct 2026)
- National Law Information Center: 원자력시설 등의 방호 및 방사능 방재 대책법 (current version record) (government, accessed 29 Oct 2026)