Policy and licensing / United States (federal)

NRC direct final rule: Revising the Duration of Design Certifications

NRC rule in force since 15 September 2025 that makes US design certifications valid for 40 years instead of 15, both for the five certifications then in effect, including NuScale's, and for future ones. Issue dates are unchanged. It certifies no design and licenses no reactor.

Category
Laws, rules and executive directives
Status
In effect
Instrument
final rule · 90 FR 28869 (direct final rule, 2 July 2025), FR Doc. 2025-12396, docket NRC-2025-0018, RIN 3150-AL26; effective date confirmed at 90 FR 41503 (26 August 2025)
Issued by
U.S. Nuclear Regulatory Commission
Jurisdiction
United States (federal)
Affects
NRC licensing
In effect from
15 Sep 2025
Expiry or completion
None recorded
Operative text
Federal Register 90 FR 28869 (2 July 2025): NRC direct final rule, Revising the Duration of Design Certifications (GovInfo text) (Federal Register direct final rule text (GovInfo HTML), 90 FR 28869-28873, with the 26 August 2025 confirmation)
Record reviewed · next review
30 Oct 2026 · 30 Apr 2027 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

NRC regulation amending 10 CFR part 52 so that a design certification is generically valid for 40 years from its date of issuance instead of 15 (s. 52.55(a)), with a conforming change for renewal applications (s. 52.57) and a renewal duration of not more than 40 years (s. 52.61). It applies generically and to the five design certifications then in effect, appendices A (ABWR), D (AP1000), E (ESBWR), F (APR1400) and G (NuScale) to part 52, without changing their dates of issuance or renewal, and not to the two expired certifications. The Commission approved the change in a staff requirements memorandum of 14 November 2024, and the NRC states the rule is consistent with Executive Order 14300. It certifies no new design and approves no reactor, site or project.

Not approved or still pending

Changes the duration of design certifications only. Whether a design is certified, or an application references a certification, is recorded among regulatory actions, not here. (Record checked .)