Policy and licensing / United States (federal)
NRC consultation: draft non-light-water reactor materials guidance
NRC published a request for comment on 21 September 2026 on draft DANU-ISG-2023-01, Revision 1, covering material compatibility for non-light-water reactors. This record establishes the consultation notice, not the contents or adoption of the underlying guidance.
- Category
- Bills, proposed rules and consultations
- Status
- Proposed — not in effect
- Instrument
- consultation · 91 FR 59813; FR Doc. 2026-19217; NRC-2022-0215
- Issued by
- U.S. Nuclear Regulatory Commission
- Jurisdiction
- United States (federal)
- Affects
- NRC licensing
- Effective date
- Not recorded
- Expiry or completion
- None recorded
- Operative text
- U.S. Nuclear Regulatory Commission: Draft Interim Staff Guidance: Material Compatibility for Non-Light Water-Reactors (As published; full official notice text read)
- Record reviewed · next review
- 11 Nov 2026 · 9 Feb 2027 (dates our review of this record; not a statement of the measure's present legal effect)
Legal and geographic scope
NRC published a request for comment on 21 September 2026 on draft DANU-ISG-2023-01, Revision 1, covering material compatibility for non-light-water reactors. This record establishes the consultation notice, not the contents or adoption of the underlying guidance.
Not approved or still pending
The underlying interim staff guidance was not opened. The notice's 5 November 2026 comment deadline has passed; that does not establish adoption. It does not establish an effective guidance document or reactor permission. The Federal Register showed no extension or final guidance through 10 November 2026. (Record checked .)
Dated lifecycle
- 21 Sep 2026 · Published — Publication of the instrument described here. Later final disposition not established. (U.S. Nuclear Regulatory Commission: Draft Interim Staff Guidance: Material Compatibility for Non-Light Water-Reactors)
- 5 Nov 2026 · Comment period closed (Federal Register 91 FR 59813 (21 Sep 2026), govinfo text: Draft Interim Staff Guidance, Material Compatibility for Non-Light Water Reactors)
Projects or designs named by the source
- None. Location in this jurisdiction does not make a project eligible for, or approved under, this measure.
Sources
- U.S. Nuclear Regulatory Commission: Draft Interim Staff Guidance: Material Compatibility for Non-Light Water-Reactors (regulator, published 21 Sep 2026, accessed 3 Nov 2026)
- Federal Register 91 FR 59813 (21 Sep 2026), govinfo text: Draft Interim Staff Guidance, Material Compatibility for Non-Light Water Reactors (regulator, published 21 Sep 2026, accessed 11 Nov 2026)