Policy and licensing / United States (federal)

Proposed modernization of NRC radiation-protection standards

NRC proposed revisions to its radiation-protection standards on 15 July 2026, with comments due 31 August. The proposal includes rules used in reactor licensing and draft implementing guidance. No final rule or effective date is established by this notice, and it grants no reactor permission.

Category
Bills, proposed rules and consultations
Status
Proposed — not in effect
Instrument
proposed rule · 91 FR 43456, FR Doc. 2026-14208, docket NRC-2025-1140, RIN 3150-AL47
Issued by
U.S. Nuclear Regulatory Commission
Jurisdiction
United States (federal)
Affects
NRC licensing
Effective date
Not recorded
Expiry or completion
None recorded
Operative text
NRC: proposed radiation-protection framework revisions (Proposed rule and draft implementing guidance)
Record reviewed · next review
2026-10-17 · 2027-01-15 (dates our review of this record; not a statement of the measure's present legal effect)

Legal and geographic scope

Proposed revisions to 10 CFR Parts 19, 20, 34, 35, 40, 50, 53, 61, 71 and 72 and draft implementing guidance. This crosscutting proposal includes reactor licensing but is not a project-specific applicability finding.

Not approved or still pending

The opened notice is a proposal. It establishes no final rule, effective date, approved design or project permission. The 31 August 2026 comment deadline it sets is in the past. No later extension notice was reviewed here.

Dated lifecycle

Related instruments

Projects or designs named by the source

Sources