Programmes and agreements / prg-sa-kacare-cnec-htr

K.A.CARE and CNEC memorandum and feasibility study for a high-temperature gas-cooled reactor in Saudi Arabia

On 19 January 2016 K.A.CARE and CNEC signed a memorandum on building a high-temperature gas-cooled reactor in Saudi Arabia, without size or timeline. A joint working group began a feasibility study in May 2017, aiming to finish that year. No later step is recorded.

Type
Cooperation agreement or MOU
Countries concerned
Saudi Arabia
Participants and roles
  • Government: King Abdullah City for Atomic and Renewable Energy (K.A.CARE)
  • Developer or vendor: China Nuclear Engineering Corporation (CNEC)
Designs named
HTR-PM
Scale as stated
no size disclosed
Announced or first reported
19 Jan 2016
Status
Status not established
MoU (Jan 2016) and joint feasibility study begun (May 2017), no later step found.
Confidence
low
Last checked
2026-10-14 (record review date, not proof of current activity)

Sources