Designs

HTR-PM

Modular high-temperature gas-cooled demonstration plant: two pebble-bed reactor modules of 250 MWth each feed one steam turbine-generator. The recorded 210 MWe gross and 500 MWth are plant totals (IAEA ARIS); no separate per-module electrical rating is stated. ARIS says the plant is designed by INET, Tsinghua University, and that Chinergy was designated main contractor of the nuclear island. Designer and contractor are not stored as the plant vendor. The report does not name China National Nuclear Corporation, so that earlier vendor link is not kept. PRIS names China Huaneng Group as owner and Tsinghua University as reactor supplier. The reactor-supplier label is not stored as the plant vendor.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Operating: HTR-PM Shidaowan demonstration.
Evidence
5 sources; first primary source: IAEA Power Reactor Information System (PRIS). Record reviewed 19 Oct 2026.
Schematic of HTR-PM. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Plant electrical
210 MWe (gross)
Plant thermal
500 MWth (nameplate; basis unspecified)
Capacity scope
Plant total: two reactor modules, one turbine
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Vendor (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
19 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Developer / vendor(s)
Not recorded

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(5)

Evidence and open questions

(2 notes)
  • Evidence review. World Nuclear Association's China profile describes the HTR-PM (HTR Pebble-bed Modular) at Shidaowan as twin 250 MWt pebble-bed, helium-cooled reactor modules, each with its own steam generator, driving a single 210 MWe steam turbine, built by a China Huaneng-led consortium with CNEC and with Tsinghua University's INET as R&D leader, and with Chinergy as nuclear-island main contractor. The 210 MWe is a plant total for two modules; IAEA PRIS statistics (captured 9 October 2026) list the operating Shidao Bay-1 unit, model HTR-PM, at 500 MWt, 211 MWe gross, 150 MWe net and 200 MWe design net, again plant-level values. WNA dates first criticality of the two reactors to September and November 2021 and commercial operation to December 2023, which together with PRIS connects the linked operating Shidaowan demonstration. The IAEA ARIS status report names INET, Tsinghua University, as the designer of the HTR-PM, and WNA calls INET the R&D leader, while Huaneng (owner), CNEC/Chinergy (contractor) and the PRIS reactor-supplier label are further roles; following the existing vendor review, none of these is stored as the plant vendor. The stored HTGR family, helium coolant, thermal spectrum, 500 MWth and plant-level 210 MWe gross with its plant-total note stay. The gross label comes from the overview table of the ARIS status report (published 11 October 2024); WNA's 210 MWe turbine sentence does not say gross or net, and PRIS gives 211 MWe gross rather than 210. Last checked 19 Oct 2026. China HTR-PM commercial operation reporting; IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026; IAEA ARIS status report: HTR-PM (China)
    What would change this

    A coordinator decision on whether the designer (INET) is recorded as design vendor, or an INET or CNNC/Chinergy document naming the HTR-PM technology owner for commercial supply. Next scheduled check: 19 Jan 2027.

  • Vendor: Not disclosed in the reviewed evidence. The opened ARIS report names a designer and a nuclear-island contractor and does not name a plant vendor or China National Nuclear Corporation. PRIS names Tsinghua University as reactor supplier. That label is not stored as the plant vendor. The earlier vendor links to China National Nuclear Corporation and China Huaneng Group are not kept. Last checked 19 Oct 2026. IAEA ARIS status report: HTR-PM (China); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026
    What would change this

    An ARIS, PRIS or company document that names the HTR-PM plant vendor as a role distinct from designer, contractor and reactor supplier. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Operating-license applications and decisions