Projects / Indonesia · Announced
Pupuk Kaltim nuclear-powered ammonia study at Bontang
A May 2023 memorandum among Copenhagen Atomics, Topsoe, Alfa Laval, Aalborg CSP, Pupuk Kaltim and Pertamina New & Renewable Energy studied an ammonia facility in Bontang.
Current status
- How current
- General record check . Bounded evidence review . 2 of 3 listed sources have a publication or document date recorded here; the newest is 19 May 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Copenhagen Atomics' page says the nuclear plant would be 1 GW from 25 SMRs and would run for 50 years, with an expected opening in 2028. Topsoe's page of the same memorandum assigns 1 GW to electrolysis capacity and also says the plant would consist of 25 SMRs. Those figures are not stored as a selected module count or plant output. The design version is not confirmed, and later status is unknown.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Pupuk Kalimantan Timur, Copenhagen Atomics
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Pupuk Kaltim, Bontang · Indonesia · precision: site area (named plant, laboratory, base, port, campus or parcel)
Point from the Wikipedia article for Pupuk Kaltim, whose ammonia and urea plants are in one location in Bontang; a company-complex point for the named industrial host, not a reactor position. - Coordinates
- 0.1863, 117.47878 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- low
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Pupuk Kaltim nuclear-powered ammonia study at Bontang is recorded at Pupuk Kaltim, Bontang, East Kalimantan, Indonesia. Operator: Pupuk Kalimantan Timur, Copenhagen Atomics. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: Wikipedia: Pupuk Kalimantan Timur (article coordinates), Article coordinate 0.1863, 117.47878 on 'Pupuk Kalimantan Timur', read 30 October 2026
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorPupuk Kalimantan Timur
- OperatorCopenhagen Atomics
- Contractor
Source-backed project statement The May 2023 memorandum, as reported by World Nuclear News and Topsoe, would have Copenhagen Atomics deliver the thorium molten-salt reactors, Topsoe the electrolysis cells and ammonia synthesis, and Alfa Laval and Aalborg CSP heat-exchange and thermal-storage equipment for a Bontang ammonia facility. The memorandum is to investigate building the facility. It is not a supply or construction contract, and Copenhagen Atomics described it as a step before a final agreement. WNN: SMRs considered for Indonesian fertiliser plant; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
Copenhagen Atomics' 19 May 2023 page says the reactors would power an ammonia facility in Bontang producing about one million tonnes a year, possibly also for marine fuel. Neither that page, Topsoe's 18 May 2023 page nor World Nuclear News' 19 May 2023 report names a buyer of the plant's power, heat or ammonia under an agreement. Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023
- Funding and government decisions
World Nuclear News on 19 May 2023 gives an estimated investment of USD 4 billion for the Bontang ammonia facility, and Copenhagen Atomics the same day says construction is expected to cost about USD 4 billion while the economics are not finalised. These are cost estimates, not financing. Neither source names a funder, instrument or committed amount for the facility or its reactors. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
The May 2023 World Nuclear News and Copenhagen Atomics pages say Copenhagen Atomics would supply thorium molten-salt reactors and describe thorium's abundance. That is a design and company description. Neither names a fuel supplier, quantity or delivery for the Bontang reactors. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023
- Comparable schedule revision
Comparable schedule revision not established. World Nuclear News and Copenhagen Atomics each said on 19 May 2023 that the Bontang facility was expected to open in 2028, and Topsoe's 18 May 2023 page gives no year. The same target stated in two same-day sources is not a revision, and no later opening date was read. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. Copenhagen Atomics' 19 May 2023 news page and Topsoe's 18 May 2023 press page both describe a memorandum with Pupuk Kaltim and Pertamina New & Renewable Energy for an ammonia facility in Bontang that uses Copenhagen Atomics' modular thorium reactors. Either page is a company publication about this project and supplies the missing primary source. Copenhagen Atomics calls the nuclear plant 1 GW from 25 SMRs, to run 50 years, and says the facility is expected to open in 2028. Topsoe assigns 1 GW to electrolysis capacity in the same sentence that says the plant consists of 25 SMRs. The pages also differ on the signing day (Topsoe dates the page 18 May and says the memorandum was signed that day; Copenhagen Atomics dates the page 19 May and says it was signed on 19 May). None of the count, the gigawatt figure, the 50-year life, the 2028 target, or a signing-day event is stored. The memorandum is still a study step: Copenhagen Atomics says the signature is the last step ahead of the final agreement, and Topsoe says the partners will investigate operational and regulatory conditions. No reactor model name is stated. Stored operator ids are left as they are. The broad last-checked date stays 2026-10-02. Last checked 20 Oct 2026. WNN: SMRs considered for Indonesian fertiliser plant; Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023
What would change this
A later Pupuk, Pertamina or Copenhagen Atomics decision that selects one reactor model and one module count, or that ends the study. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The article names Copenhagen Atomics thorium molten-salt SMR modules. It does not name a design version that matches a stored design record. The technology family is not treated as a design link. Last checked 19 Oct 2026. WNN: SMRs considered for Indonesian fertiliser plant
What would change this
A study report naming the reactor model would settle the design. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The article places the facility in the city of Bontang, East Kalimantan. It does not name a plot or say the plant would stand on the existing Pupuk works. Last checked 19 Oct 2026. WNN: SMRs considered for Indonesian fertiliser plant
What would change this
A study siting note or an Indonesian license application naming the plot would settle the site. Next scheduled check: 19 Jan 2027.
- Primary source. The Copenhagen Atomics news page and the Topsoe press page are company publications about this Bontang memorandum. Attaching either one fills the primary-source predicate. There is no separate field edit because the source register is not a side-path field. World Nuclear News remains a press account of the same memorandum. Last checked 20 Oct 2026. Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023; Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023
What would change this
No further primary page is required for this memorandum. A later project decision would be a new instrument. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. The May 2023 releases set a six-month horizon to finish final examinations and map Indonesia's legal framework, with the project's economics not yet finalized. That horizon has passed and the sources reviewed record no later study result or decision. Last checked 23 Oct 2026. Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023
What would change this
A PKT, Pertamina or Copenhagen Atomics statement on the study outcome or a next phase. Next scheduled check: 21 Jan 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. The May 2023 memorandum releases describe a joint study and say the final examinations and a full mapping of Indonesia's legal landscape were still to be completed within six months. They name no regulator application, site permit or public consultation for the Bontang plant. Last checked 23 Oct 2026. Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023; WNN: SMRs considered for Indonesian fertiliser plant
What would change this
A BAPETEN licensing, site-evaluation or environmental-permit record for the Bontang project. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). The 2023 memorandum concerned a study of an ammonia facility in Bontang, East Kalimantan, with a nuclear plant of 25 modules totalling 1 GW. The releases describe no plot, land arrangement, grid connection or cooling-water source. Last checked 23 Oct 2026. WNN: SMRs considered for Indonesian fertiliser plant
What would change this
A feasibility study or site-evaluation report for the Bontang plant. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(2 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- WNN: SMRs considered for Indonesian fertiliser plant (news report, accessed 2 Oct 2026)
- Copenhagen Atomics: Bontang ammonia memorandum, 19 May 2023 (company, published 19 May 2023, accessed 20 Oct 2026)
- Topsoe: Bontang ultra-low-emission ammonia memorandum, 18 May 2023 (company, published 18 May 2023, accessed 20 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Pupuk Kaltim nuclear-powered ammonia study at Bontang — https://smrmap.com/projects/bontang-pkt-msr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Pupuk Kaltim nuclear-powered ammonia study at Bontang”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/bontang-pkt-msr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.