Announced SMR projects
96 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.
A deployment proposal has been made public; later activity is not yet established here.
The recorded stage is separate from permission and does not guarantee current activity. Read each project’s dated evidence.
10 of these are earlier-plan records: proposals kept from earlier plans, agreements, catalogs and country profiles. Their present status is not established, and their recorded stage is the last one evidenced, not proof of current activity.
Argentina: 1 · Belgium: 1 · Canada: 4 · China: 9 · Finland: 1 · France: 4 · Ghana: 1 · Indonesia: 4 · Myanmar: 1 · Netherlands: 2 · Poland: 5 · Romania: 2 · Russia: 5 · South Africa: 2 · South Korea: 1 · Ukraine: 3 · United Kingdom: 6 · United States: 44
Open these projects in Projects (on the map) · Coverage and stage definitions · Dated developments for all projects (Updates)
Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.
Projects
Showing 96 of 96 projects
No projects match these filters. Reset filters
| Project and category | Country | Design | Capacity | Recorded organizations | Location | Record reviewed |
|---|---|---|---|---|---|---|
| Aalo fleet proposal at Idaho Falls Power's Energy Research ParkMicroreactor | United States | Aalo-1 | — |
| Idaho Falls Power Energy Research ParkIdaho · town-level point (approximate) | 9 Oct 2026Latest source 15 Sep 2026Latest event: none dated |
| Aalo Project Ascension power-reactor proposal at INLSMR | United States | Design profile not linked | 10 MWe (gross/net unspecified) · module |
| Project Ascension proposed area on the Aalo-X campus at INLIdaho · site-area point (approximate) | 15 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026 |
| ACR-300 SMR proposal at Atucha (Meitner Energy)SMR | Argentina | ACR-300 | 300 MWe (gross/net unspecified) · plant |
| Atucha nuclear power plant sitesite-area point (approximate) | 6 Oct 2026Latest source: none datedLatest event 23 Sep 2026 |
| AEP Rockport BWRX-300 proposalSMR | United States | BWRX-300 | — |
| Rockport Plant, Spencer County (I&M SMR site)Indiana · site-area point (approximate) | 10 Oct 2026Latest source 23 Jul 2026Latest event 17 Jan 2025 |
| ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program)SMR | Romania | ALFRED lead-cooled fast-reactor demonstrator | MWe not recorded · plant · 300 MWth (nameplate; basis unspecified) |
| RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate) | 13 Oct 2026Latest source 20 Aug 2021Latest event: none dated |
| Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)SMR | United States | Xe-100 | 960 MWe (gross/net unspecified) · plant |
| Former Breed Generating Station site, Sullivan CountyIndiana · named site, no map pin | 30 Oct 2026Latest source 19 Oct 2026Latest event: none dated |
| Ameren / Westinghouse SMR proposal at Callaway (2012)SMR | United States | Design profile not linked | — |
| Callaway site (Ameren Missouri)Missouri · site-area point (approximate) | 2 Oct 2026Latest source 21 Feb 2014Latest event: none dated |
| Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundSMR | United States | IMSR (Integral Molten Salt Reactor) | — |
| Aberdeen Proving Ground (Phase 2 site)Maryland · site-area point (approximate) | 18 Oct 2026Latest source 9 Oct 2026Latest event 21 Sep 2026 |
| Antares Mark-1 electricity-producing microreactor at INLMicroreactor | United States | Design profile not linked | — |
| MFC-793 test facility, INL Materials and Fuels ComplexIdaho · site-area point (approximate) | 24 Oct 2026Latest source 27 Oct 2026Latest event 23 Oct 2026 |
| Antares R1 microreactors at Fort Bragg (Army Janus)Microreactor | United States | R1 | — |
| Fort BraggNorth Carolina · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| ARC-100 first-of-a-kind deployment framework at Idaho National LaboratorySMR | United States | ARC-100 | 100 MWe (gross/net unspecified) · module |
| Idaho National Laboratory (ARC-100 first-of-a-kind; location within INL not stated)Idaho · town-level point (approximate) | 3 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026 |
| ARC-100 proposal at the Port of Belledune Green Energy HubSMR | Canada | ARC-100 | — |
| Port of Belledune Green Energy HubNew Brunswick · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)Microreactor | United States | KRONOS MMR | — |
| BaRupOn LAMP hub, LibertyTexas · town-level point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Beck Creek Energy SMR proposal (Amherst County)SMR | United States | Design profile not linked | — |
| Beck Creek Energy site, eastern Amherst CountyVirginia · named site, no map pin | 30 Oct 2026Latest source 8 Oct 2026Latest event: none dated |
| Belledune Prodigy transportable nuclear proposalMicroreactor | Canada | BWXT BANR | — |
| BelleduneNew Brunswick · town named, no map pin | 13 Oct 2026Latest source 5 Oct 2026Latest event 5 Oct 2026 |
| BWXT BANR at Fort Campbell (Army Janus)Microreactor | United States | BWXT BANR | 20 MWe (gross/net unspecified) · plant |
| Fort CampbellKentucky · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Calogena NetZeroHeat CAL30 heat reactor for PierrelatteMicroreactor | France | CAL-30 | thermal only |
| Pierrelatte (Calogena proposed heat reactor)Auvergne-Rhône-Alpes · town named, no map pin | 11 Nov 2026Latest source, document dated 2 Nov 2026Latest event: none dated |
| Cambridge Atomworks ODIN prototype at Berkeley GreenMicroreactor | United Kingdom | ODIN | — |
| Berkeley Green Science and Technology ParkEngland · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Centrica / X-energy Xe-100 plant at HartlepoolSMR | United Kingdom | Xe-100 | — | Hartlepool site (EDF and Centrica)England · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated | |
| CGN Bohai ACPR50S floating SMR demonstration proposalSMREarlier-plan record | China | ACPR50S | — | Bohai Searegion only, no map pin | 2 Oct 2026Latest source 18 Jan 2016Latest event: none dated | |
| CNNC floating SMR demonstration proposal (2016)SMREarlier-plan record | China | ACP100S | — |
| Undisclosed | 14 Oct 2026Latest source 15 Jan 2016Latest event: none dated |
| Community Nuclear Power North Teesside AP300 proposalSMR | United Kingdom | AP300 | ≈ 1,200 MWe (derived) |
| North TeessideEngland · region only, no map pin | 1 Oct 2026Latest source: none datedLatest event 8 Feb 2024 |
| Deep Atomic MK60 AI data-center campus proposal at INLSMR | United States | MK60 | — |
| Idaho National Laboratory (proposed AI data-center campus)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Deployable Energy–Hornbeck Unity maritime demonstration proposalMicroreactor | United States | Unity | — |
| Undisclosed | 13 Oct 2026Latest source 28 Aug 2026Latest event: none dated |
| Dominion North Anna SMR proposalSMR | United States | Design profile not linked | — |
| North Anna Power Station, Louisa CountyVirginia · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)SMREarlier-plan record | Ukraine | Holtec SMR-160 | — |
| Rivne NPP — historical SMR-160 replacement proposalsite-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Energoatom SMR at the Trypilska thermal plant siteSMR | Ukraine | Design profile not linked | — |
| Trypilska thermal power plantKyiv Oblast · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)SMR | United States | EAGL-1 | — |
| Indianaregion only, no map pin | 11 Oct 2026Latest source 15 Apr 2026Latest event 4 Nov 2025 |
| First ELENA-AM thermoelectric heating pilot proposalSMR | Russia | ELENA-AM | — |
| Undisclosed | 13 Oct 2026Latest source Sep 2023Latest event: none dated |
| Floating nuclear power unit for Gazprom's Kirinskoye fields, SakhalinSMR | Russia | RITM-200S | 116 MWe (gross/net unspecified) · plant | Kirinskoye and Yuzhno-Kirinskoye gas-condensate fieldsSakhalin Oblast · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated | |
| General Atomics GA-TES at Fort Hood (Army Janus)Microreactor | United States | GA-TES | 5 MWe (gross/net unspecified) · plant |
| Fort HoodTexas · site-area point (approximate) | 10 Oct 2026Latest source 15 Oct 2026Latest event: none dated |
| GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complexSMR | South Korea | Design profile not linked | — | Not recorded | Uljin Nuclear Hydrogen National Industrial ComplexNorth Gyeongsang · named site, no map pin | 8 Oct 2026Latest source 6 May 2023Latest event: none dated |
| HAPPY200 nuclear heating project at Baishan, JilinSMR | China | HAPPY200 | thermal only |
| Baishan nuclear heating project siteJilin · town named, no map pin | 2 Oct 2026Latest source 9 Dec 2019Latest event: none dated |
| Hexana first SMR in the Gard rhodanien areaSMR | France | HEXANA | — |
| Gard rhodanienOccitanie · region only, no map pin | 5 Oct 2026Latest source: none datedLatest event: none dated |
| Holtec / EDF SMR-300 proposal at CottamSMR | United Kingdom | Holtec SMR-300 | — |
| Former Cottam power stationEngland · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Holtec Green River / Blue Castle, Utah proposalSMR | United States | Holtec SMR-300 | — |
| Green River, Blue Castle projectUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 28 May 2026 |
| Holtec Oyster Creek SMR proposalSMR | United States | Holtec SMR-300 | 1360 MWe (gross/net unspecified) · plant |
| Oyster Creek Generating Station site, Lacey TownshipNew Jersey · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 30 Jul 2026 |
| Holtec SMR-160 proposal at Savannah River Site (2012)SMREarlier-plan record | United States | Holtec SMR-160 | 160 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 5 Mar 2012Latest event: none dated |
| Holtec SMR-300 proposal in Brigham City, UtahSMR | United States | Holtec SMR-300 | — |
| Brigham CityUtah · town named, no map pin | 2 Oct 2026Latest source, document dated 19 Nov 2025Latest event: none dated |
| HTGR-POLA research reactor (NCBJ)SMR | Poland | HTGR-POLA | MWe not recorded · plant · 30 MWth (nameplate; basis unspecified) |
| NCBJ Świerk site, OtwockMasovian · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Huaneng Xiapu 600 MW HTGR unit (site plan)SMR | China | Design profile not linked | — |
| Xiapu nuclear site (Changbiao Island)Fujian · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Hyperion / Gen4 Module proposal at Savannah River Site (2012)SMREarlier-plan record | United States | G4M | 25 MWe (gross/net unspecified) · module · 70 MWth (nameplate; basis unspecified) |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source 24 Sep 2024Latest event: none dated |
| Kaliningrad floating small nuclear plants proposalSMR | Russia | Design profile not linked | — |
| Kaliningrad Oblastregion only, no map pin | 13 Oct 2026Latest source 1 Oct 2026Latest event: none dated |
| Keravan Energia / Steady Energy nuclear district-heating plantSMR | Finland | LDR-50 | thermal only |
| KeravaUusimaa · town named, no map pin | 5 Oct 2026Latest source 26 Jun 2026Latest event: none dated |
| Last Energy first KSSE plant proposalMicroreactor | Poland | Design profile not linked | 20 MWe (gross/net unspecified) · plant |
| Katowice Special Economic Zone (KSSE)region only, no map pin | 14 Oct 2026Latest source 23 Mar 2023Latest event: none dated |
| Last Energy London Gateway PWR-20 proposalMicroreactor | United Kingdom | PWR-20 | 20 MWe (gross/net unspecified) · module |
| London Gateway portsite-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event 15 Sep 2025 |
| Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)Microreactor | Romania | PWR-20 | — |
| RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)Microreactor | Poland | PWR-20 | 200 MWe (gross/net unspecified) · plant |
| Legnica Special Economic ZoneLower Silesia · region only, no map pin | 2 Oct 2026Latest source 23 Mar 2023Latest event: none dated |
| LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program)SMR | Belgium | Design profile not linked | — | SCK CEN MolAntwerp · site-area point (approximate) | 2 Oct 2026Latest source 9 Oct 2026Latest event: none dated | |
| Liaoyuan DHR-400 heating demonstration proposalSMREarlier-plan record | China | Yanlong DHR-400 | thermal only |
| Liaoyuan DHR-400 demonstration location (undisclosed)Jilin · town named, no map pin | 13 Oct 2026Latest source, document dated 4 Sep 2023Latest event: none dated |
| Maoming Green Energy HTGR proposal (Phase 1 planning)SMR | China | Design profile not linked | — | Not recorded | Maoming Green Energy / Zero-Carbon Industrial Park (HTGR component)Guangdong · named site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Meta–TerraPower initial dual-unit Natrium proposalSMR | United States | Natrium | 690 MWe (gross/net unspecified) · plant |
| Undisclosed | 13 Oct 2026Latest source 9 Jan 2026Latest event: none dated |
| Microreactor at Naval Weapons Station CraneMicroreactor | United States | Kaleidos | — |
| Naval Weapons Station CraneIndiana · site-area point (approximate) | 25 Oct 2026Latest source 20 Oct 2026Latest event 20 Oct 2026 |
| Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)SMR | United States | Design profile not linked | — | Midpoint SMR Project #1 (Jerome County BLM)Idaho · site-area point (approximate) | 2 Oct 2026Latest source 22 Aug 2025Latest event: none dated | |
| Moltex SSR-W at Point LepreauSMR | Canada | SSR-W | — |
| Point Lepreau Nuclear Generating Station siteNew Brunswick · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Myanmar 110 MW SMR project (two RITM-200N; site not named)SMR | Myanmar | RITM-200N | 110 MWe (gross/net unspecified) · plant |
| Undisclosed | 6 Oct 2026Latest source 24 Aug 2026Latest event 24 Aug 2026 |
| NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)Microreactor | United States | Design profile not linked | — |
| Digihost 60 MW power plant, North Tonawanda, New YorkNew York · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Necsa SMR demonstration reactor at PelindabaSMR | South Africa | Design profile not linked | — |
| Necsa Pelindaba complexNorth West · site-area point (approximate) | 6 Oct 2026Latest source 31 Mar 2026Latest event: none dated |
| Nine Mile Point Gen III+ SMR early site permit evaluationSMR | United States | Design profile not linked | — |
| Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation)New York · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Ningdu multipurpose modular proposal (14th Five-Year plan)SMREarlier-plan record | China | Design profile not linked | 600 MWe (gross/net unspecified) · plant | Not recorded | Ningdu multipurpose modular proposal (historical plan)Jiangxi · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Norilsk land small nuclear plant (RITM-400)SMR | Russia | RITM-400 | 320 MWe (gross/net unspecified) · plant |
| Norilsk (small nuclear plant location to be selected)Krasnoyarsk Krai · town named, no map pin | 6 Oct 2026Latest source: none datedLatest event: none dated |
| Northern Halmahera floating nuclear power units (Rosatom, two FPU-100)SMR | Indonesia | Design profile not linked | 200 MWe (gross/net unspecified) · plant |
| northern Halmahera IslandNorth Maluku · region only, no map pin | 30 Oct 2026Latest source 20 Oct 2026Latest event: none dated |
| Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabMicroreactor | United States | Morpheus | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)SMR | Ghana | NuScale VOYGR (US460 / NPM) | 924 MWe (gross/net unspecified) · plant |
| Undisclosed | 5 Oct 2026Latest source: none datedLatest event 27 Mar 2025 |
| NuCube test microreactor at the Utah San Rafael Energy LabMicroreactor | United States | NuSun-1 | — |
| Utah San Rafael Energy LabUtah · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| NuScale plant proposal at Savannah River Site (2012)SMREarlier-plan record | United States | Design profile not linked | 45 MWe (gross/net unspecified) · module |
| Savannah River SiteSouth Carolina · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)Microreactor | United States | Aurora | 50 MWe (gross/net unspecified) · plantProposed collective electricity supply under a non-binding letter of intent; this figure does not establish a selected plant or module nameplate. |
| Permian Basin operations near MidlandTexas · region only, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| OSGE Warsaw potential BWRX-300 location (2023 list)SMR | Poland | BWRX-300 | — |
| Warszawa (OSGE potential location)Masovian · town named, no map pin | 2 Oct 2026Latest source 11 Feb 2025Latest event: none dated |
| Otrera precursor (first demonstration) reactor at CEA MarcouleSMR | France | Design profile not linked | — |
| CEA Marcoule centerOccitanie · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Penn State FRONTIER eVinci research proposalMicroreactor | United States | eVinci | — |
| University Park campus, Penn StatePennsylvania · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Project TETRA / TETRA-1 pilot at Texas A&M RELLISSMR | United States | IMSR (Integral Molten Salt Reactor) | — |
| Texas A&M RELLIS campus — TETRA-1 planned sitesite-area point (approximate) | 2 Oct 2026Latest source 8 Jan 2026Latest event: none dated |
| Pupuk Kaltim nuclear-powered ammonia study at BontangSMR | Indonesia | Design profile not linked | — |
| Pupuk Kaltim, BontangEast Kalimantan · site-area point (approximate) | 2 Oct 2026Latest source 19 May 2023Latest event: none dated |
| Purdue / Duke Energy SMR feasibility study for the Purdue campusSMR | United States | Design profile not linked | — |
| Purdue University campus, West LafayetteIndiana · site-area point (approximate) | 2 Oct 2026Latest source 10 May 2023Latest event: none dated |
| Pylon / LOKI MMR experiment proposal for INL's DOMEMicroreactor | United States | LOKI MMR | — |
| DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate) | 2 Oct 2026Latest source 7 Oct 2026Latest event: none dated |
| Radiant Kaleidos microreactors at Fort Benning (Army Janus)Microreactor | United States | Kaleidos | 3 MWe (gross/net unspecified) · plant |
| Fort BenningGeorgia · site-area point (approximate) | 10 Oct 2026Latest source: none datedLatest event: none dated |
| Ruijin HTR nuclear power proposal (Jiangxi)SMR | China | Design profile not linked | — | Not recorded | RuijinJiangxi · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)SMR | Russia | RUTA-70 | 70 MWth (thermal only; nameplate; basis unspecified) | Not recorded | Institute of Physics and Power Engineering (IPPE), ObninskKaluga Oblast · site-area point (approximate) | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Shearwater NuScale Wylfa feasibility proposal (2021)SMREarlier-plan record | United Kingdom | NuScale VOYGR (US460 / NPM) | 924 MWe (gross/net unspecified) · plant |
| Wylfa Magnox — Shearwater NuScale feasibility proposalWales · site-area point (approximate) | 2 Oct 2026Latest source 23 Sep 2021Latest event: none dated |
| Standard Power NuScale SMR facility in Ohio (site not disclosed)SMR | United States | Design profile not linked | — |
| Ohioregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)SMR | United States | Design profile not linked | — |
| Pennsylvaniaregion only, no map pin | 5 Oct 2026Latest source: none datedLatest event 6 Oct 2023 |
| StarCore demonstration reactor at the Whiteshell Laboratories site, PinawaSMR | Canada | Design profile not linked | — |
| Whiteshell Laboratories site, PinawaManitoba · site-area point (approximate) | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU)SMR | France | Stellarium | — |
| Fos-sur-Mer industrial area (integrated energy hub)Provence-Alpes-Côte d'Azur · named site, no map pin | 3 Oct 2026Latest source: none datedLatest event: none dated |
| Stratek Global HTMR-100 at Zilkaats EstateSMR | South Africa | HTMR-100 | 35 MWe (gross/net unspecified) · module · 100 MWth (nameplate; basis unspecified) |
| Zilkaats Estate, De Wildtnamed site, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Surry Green Energy Center SMR campus proposalSMR | United States | Design profile not linked | — | Not recorded | Surry Green Energy Center SMR campus proposalVirginia · site-area point (approximate) | 2 Oct 2026Latest source 13 Feb 2024Latest event: none dated |
| Tata / BWXT BANR Green River, Wyoming proposalMicroreactor | United States | BWXT BANR | — |
| Tata Chemicals Soda Ash Partners site, Green RiverWyoming · site-area point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| TEPLATOR heat-only reactor for Slavutych district heatingSMR | Ukraine | TEPLATOR | thermal only |
| Slavutych district heatingKyiv Oblast · town named, no map pin | 2 Oct 2026Latest source: none datedLatest event: none dated |
| Thorizon One first commercial molten-salt reactor in ZeelandSMR | Netherlands | Thorizon One | — |
| BorsseleZeeland · region only, no map pin | 13 Oct 2026Latest source: none datedLatest event: none dated |
| Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, PettenSMR | Netherlands | Thorizon PIONEER nuclear demonstrator | — |
| NRG PALLAS site, PettenNoord-Holland · town-level point (approximate) | 13 Oct 2026Latest source, document dated 16 Apr 2026Latest event: none dated |
| Transformational Challenge Reactor microreactor test proposal at ORNL (2019)Microreactor | United States | Design profile not linked | — |
| Building 7709, Copper Ridge, Oak Ridge National LaboratoryTennessee · site-area point (approximate) | 3 Oct 2026Latest source Aug 2022Latest event: none dated |
| USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)Microreactor | United States | Design profile not linked | — |
| USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed)Idaho · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
| West Kalimantan Rosatom floating RITM-200M proposal (2025)SMR | Indonesia | Design profile not linked | — |
| West Kalimantanregion only, no map pin | 6 Oct 2026Latest source 19 Oct 2026Latest event: none dated |
| West Kalimantan Rosatom land-based SMR proposal (2025)SMR | Indonesia | Design profile not linked | — |
| West Kalimantanregion only, no map pin | 6 Oct 2026Latest source 3 Jul 2026Latest event: none dated |
| Westinghouse eVinci at Fort Drum (Army Janus)Microreactor | United States | eVinci | — |
| Fort DrumNew York · site-area point (approximate) | 10 Oct 2026Latest source 26 Aug 2026Latest event: none dated |
| Yantai nuclear seawater desalination project (NHR200-I, 2003)SMREarlier-plan record | China | Design profile not linked | thermal only | Not recorded | Yantai (site not stated)Shandong · town named, no map pin | 6 Oct 2026Latest source Sep 2005Latest event Mar 2003 |
| ZE PAK–SGE Pątnów BWRX-300 proposalSMR | Poland | BWRX-300 | — | Pątnów SMR proposal (ZE PAK)site-area point (approximate) | 2 Oct 2026Latest source 14 Oct 2026Latest event: none dated | |
| ZettaJoule ZJ0 research reactor at Texas A&M (TEES)SMR | United States | Design profile not linked | — |
| TEES Nuclear Engineering & Science Center area, College StationTexas · town-level point (approximate) | 2 Oct 2026Latest source: none datedLatest event: none dated |
Research coverage for the 96 matching projects: of 864 answers to nine review questions, 292 have a supported statement, 466 were reviewed with a stated limit and 106 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.
No projects match, so there are no answers to count.
Coverage by question
Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.
| Question | Supported statement | Not disclosed | Not applicable | Conflicting evidence | Source unavailable | Not reviewed | Projects |
|---|---|---|---|---|---|---|---|
| Customer or offtaker | 23 | 69 | 0 | 0 | 0 | 4 | 96 |
| Contractor | 22 | 69 | 0 | 0 | 1 | 4 | 96 |
| Funding | 22 | 71 | 0 | 0 | 0 | 3 | 96 |
| Project fuel commitment | 6 | 86 | 0 | 0 | 0 | 4 | 96 |
| Comparable schedule revision | 0 | 88 | 0 | 4 | 0 | 4 | 96 |
| Permissions and public process | 62 | 29 | 0 | 0 | 0 | 5 | 96 |
| Site dependencies (land, grid, water) | 73 | 18 | 0 | 1 | 0 | 4 | 96 |
| Spent fuel, waste and closure | 14 | 13 | 0 | 1 | 0 | 68 | 96 |
| Next decision and prerequisites | 70 | 16 | 0 | 0 | 0 | 10 | 96 |
| All nine questions | 292 | 459 | 0 | 6 | 1 | 106 | 864 |