Projects / Norway · Siting
Dalane / Lund SMR proposal
Municipal-area studies for a proposed four-unit plant.
Current status
- How current
- General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The announced 1,200 MWe planning scenario is not a selected design or a site construction decision. No precise parcel is published.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Dalane region · Norway · precision: region only
Searchable without an invented map pin. - Coordinates
- Region only, no map pin
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 1 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Dalane / Lund SMR proposal is recorded at Dalane region, Rogaland, Norway. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: region only; region only, no map pin.
Electrical output is not recorded on this project. Modules planned: 4. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerDalane Kjernekraft AS · source
- Funding and government decisions
Source-backed project statement The 27 April 2026 release identifies Lund as a co-owner and describes financing studies and a still-distant final investment decision. It states no plant funding amount or paid contribution. Norsk Kjernekraft Dalane assessment
Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
- Customer or offtaker
The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment; Norsk Kjernekraft: locations (ten project companies)
- Contractor
The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment
- Comparable schedule revision
Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Dalane assessment
Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. Norsk Kjernekraft's 27 April 2026 release says it previously submitted a notification with a proposed assessment program to the Energy Ministry for a possible plant in the Dalane region. Dalane Kjernekraft AS has now decided to begin assessment work, initially focused on facility design, costs and financing. The release identifies Lund municipality as a co-owner of Dalane Kjernekraft AS and Norsk Kjernekraft as the earlier notifier; those roles do not appoint a reactor operator. It describes a four-SMR, 1,200 MW electrical fully built-out study scenario, with technology choice among the subjects still being assessed, rather than a selected design or authorized plant output. It explicitly says a final investment decision is still distant. No next ministry decision, final parcel or selected supplier is stated in the opened release; a ministry response, site-selection decision or investment/technology decision would resolve those limits. Siting remains the last evidenced stage; this source reading does not advance the broad review date. Dalane Kjernekraft AS decided to initiate the project assessment. It is recorded as project proposer; no reactor operator or selected supplier is established. Norsk Kjernekraft remains the earlier notifier and Lund municipality a reported co-owner. Last checked 20 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
A ministry response to the Dalane assessment-program notification, a selected site/design, or a Dalane Kjernekraft investment decision. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The Dalane notice says the study covers technology choice. It does not name a selected reactor model. The four-unit, 1,200 MW sentence stays a planning scenario and is not stored as electrical output. Last checked 19 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
Dalane Kjernekraft names a reactor vendor or model for the Lund study. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The notice discusses the study for Lund municipality and Dalane. It publishes no parcel or facility point. Last checked 19 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
A Dalane or Lund notice that identifies a parcel for the plant. Next scheduled check: 19 Jan 2027.
- Developer or proposer. Dalane Kjernekraft AS decided to initiate the project assessment. It is recorded as project proposer; no reactor operator or selected supplier is established. Norsk Kjernekraft remains the earlier notifier and Lund municipality a reported co-owner. Last checked 20 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
A later project-company or official notice defining changed development responsibilities or naming the intended operator. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. Dalane Kjernekraft's April 2026 release describes first-phase work on plant design, costs and financing and says a final investment decision is still far off. It gives no date for the authorities to set the project's own assessment program. Last checked 23 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
The ministry's decision on the Dalane program, or a site or technology selection. Next scheduled check: 21 Jan 2027.
- Permissions and public process. The April 2026 release says Norsk Kjernekraft previously sent the Energy Ministry a notification with a proposed impact-assessment program for the Dalane region, and that Dalane Kjernekraft has begun assessment work on the framework set for the separate Aure and Heim project. Dalane's own program is not reported as set, and no license or consultation outcome is recorded. Last checked 23 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
The ministry's hearing or decision setting the Dalane assessment program. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. The April 2026 release says the first assessment phase will cover the plant's technical solutions, its connection to the power system and adaptation to local conditions in Dalane. It names no site, land arrangement, grid connection point or water source. Last checked 23 Oct 2026. Norsk Kjernekraft Dalane assessment
What would change this
The Dalane notification or an impact assessment describing site, grid and cooling arrangements. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- Norsk Kjernekraft Dalane assessment (company, accessed 1 Oct 2026)
- Norsk Kjernekraft: locations (ten project companies) (company, accessed 3 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Dalane / Lund SMR proposal — https://smrmap.com/projects/dalane-smr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Dalane / Lund SMR proposal”. Record reviewed 1 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/dalane-smr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.