Siting SMR projects

65 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.

A proposed location is being selected, evaluated or characterized; pre-application regulator engagement alone remains here.

The recorded stage is separate from permission and does not guarantee current activity. Read each project’s dated evidence.

1 of these is an earlier-plan record: a proposal kept from an earlier plan, agreement, catalog or country profile. Their present status is not established, and their recorded stage is the last one evidenced, not proof of current activity.

Argentina: 1 · Canada: 3 · China: 6 · Czechia: 3 · Estonia: 1 · Finland: 2 · France: 2 · India: 3 · Indonesia: 1 · Norway: 10 · Poland: 6 · Russia: 1 · Slovakia: 1 · South Korea: 1 · Sweden: 1 · Switzerland: 1 · United Kingdom: 2 · United States: 20

Open these projects in Projects (on the map) · Coverage and stage definitions · Dated developments for all projects (Updates)

Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.

Projects

Showing 65 of 65 projects

Project and categoryCountryDesignCapacityRecorded organizationsLocationRecord reviewed
Aalo commercial proposal at Texas A&M-RELLISSMRUnited StatesAalo pod (commercial proposal)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 4 Feb 2025
AEP Joshua Falls SMR proposalSMRUnited StatesDesign profile not linked—Joshua Falls, Campbell CountyVirginia · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 17 Jan 2025
Antares microreactor at Joint Base San Antonio (ANPI)MicroreactorUnited StatesR1—Joint Base San AntonioTexas · named site, no map pin10 Oct 2026Latest source 23 Apr 2026Latest event: none dated
Antares R1 microreactor siting at INL's Central Facilities AreaMicroreactorUnited StatesR1—INL Central Facilities Area (candidate locations for an Antares R1 microreactor)Idaho · site-area point (approximate)3 Oct 2026Latest source, document dated 21 Aug 2025Latest event: none dated
BARC Visakhapatnam HTGCR hydrogen demonstration proposalSMRIndiaBARC high-temperature gas-cooled hydrogen reactor5 MWth (thermal only; nameplate; basis unspecified)BARC Vizag campusAndhra Pradesh · site-area point (approximate)6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Mar 2026
BlueCore BC-15 floating plant proposal at the Port of Long BeachSMRUnited StatesBlueCore BC-1515 MWe (gross) · module · 45 MWth (nameplate; basis unspecified)Port of Long BeachCalifornia · named site, no map pin9 Oct 2026Latest source 13 Oct 2026Latest event: none dated
Calogena nuclear heating plant at CEA CadaracheMicroreactorFranceDesign profile not linkedthermal onlyCEA CadaracheProvence-Alpes-Côte d'Azur · site-area point (approximate)5 Oct 2026Latest source: none datedLatest event: none dated
Cascade Advanced Energy FacilitySMRUnited StatesXe-100320 MWe (net) · plantHanford Reservation Cascade / Columbia GS areaWashington · site-area point (approximate)18 Oct 2026Latest source 5 Nov 2026Latest event 5 Nov 2026
CNEC / Zheneng Sanmen HTGR power stationSMRChinaHTR-PM600—Sanmen HTGR siteZhejiang · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Copenhagen Atomics critical experiment at the Paul Scherrer InstituteSMRSwitzerlandBALDER experimental configuration—Paul Scherrer Institute, VilligenAargau · site-area point (approximate)13 Oct 2026Latest source: none datedLatest event: none dated
Dalane / Lund SMR proposalSMRNorwayDesign profile not linked—DalaneRogaland · region only, no map pin1 Oct 2026Latest source: none datedLatest event: none dated
Darlington BWRX-300 Units 2-4SMRCanadaBWRX-300—Darlington New Nuclear Project siteOntario · site-area point (approximate)2 Oct 2026Latest source, document dated 12 Mar 2026Latest event: none dated
Deep Fission Gravity pilot, ParsonsSMRUnited StatesGravity—Great Plains Industrial Park, ParsonsKansas · site-area point (approximate)13 Oct 2026Latest source, document dated 17 Jul 2026Latest event 6 Aug 2026
Deployable Energy Unity full-power test in INL's DOME (2027)MicroreactorUnited StatesUnity1 MWe (gross/net unspecified) · moduleDOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)13 Oct 2026Latest source 30 Sep 2026Latest event 30 Sep 2026
Elementl Letart Township BWRX-300 proposalSMRUnited StatesBWRX-300—Letart Township, Meigs CountyOhio · town-level point (approximate)11 Oct 2026Latest source 26 Oct 2026Latest event 26 Oct 2026
Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)SMRNorwayDesign profile not linked—Proposed Fensfjorden site, AustrheimVestland · site-area point (approximate)3 Oct 2026Latest source 10 Apr 2026Latest event: none dated
Fermi Energia Estonian BWRX-300 plantSMREstoniaBWRX-300600 MWe (net) · plantUndisclosed6 Oct 2026Latest source 6 Nov 2026Latest event: none dated
Formosa commercial CAREM proposal (2010 agreement)SMREarlier-plan recordArgentinaDesign profile not linked—Formosaregion only, no map pin13 Oct 2026Latest source: none datedLatest event: none dated
Grenland Kjernekraft SMR proposal at Herre, BambleSMRNorwayDesign profile not linked—Herre, Bamble (Grenland)Telemark · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Halden Kjernekraft SMR proposal at FemsjøenSMRNorwayDesign profile not linked—Femsjøen area, HaldenØstfold · site-area point (approximate)2 Oct 2026Latest source 15 Aug 2024Latest event: none dated
Helen nuclear energy program plant in HelsinkiSMRFinlandDesign profile not linked—Helsinki (Vuosaari, Salmisaari or Norrberget)Uusimaa · town named, no map pin2 Oct 2026Latest source 5 Nov 2026Latest event: none dated
Huakun One floating reactor platform demonstration at the Taipingling siteSMRChinaHuakun One floating reactor platform50 MWe (gross/net unspecified) · plant · 200 MWth (nameplate; basis unspecified)Taipingling site operations base (harbour basin), HuidongGuangdong · site-area point (approximate)6 Oct 2026Latest source, document dated 2 Nov 2026Latest event 2 Nov 2026
Huizhou HuaPeng-1 heating demonstration proposalSMRChinaHuaPeng-1thermal onlyHuizhou HuaPeng-1 demonstration location (undisclosed)Guangdong · town named, no map pin13 Oct 2026Latest source 8 Jan 2026Latest event: none dated
Idaho State University / NuCube Advanced Research and Test ReactorMicroreactorUnited StatesDesign profile not linkedthermal onlyISU Business and Research Park, PocatelloIdaho · town-level point (approximate)13 Oct 2026Latest source 16 Sep 2026Latest event 16 Sep 2026
Kairos commercial proposal at Texas A&M-RELLISSMRUnited StatesKP-FHR commercial plant—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
KHNP SMR at the Gijang-gun candidate site (11th Basic Plan)SMRSouth KoreaDesign profile not linked—Gijang-gun SMR candidate siteBusan · town named, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
Kuopion Energia small nuclear district-heating plantSMRFinlandDesign profile not linkedthermal onlyKuopio (Hepomäki or Sorsasalo)North Savo · town named, no map pin2 Oct 2026Latest source, document dated 11 Jun 2026Latest event: none dated
Last Energy Haskell County PWR-20 campusMicroreactorUnited StatesPWR-2020 MWe (gross) · moduleHaskell CountyTexas · region only, no map pin9 Oct 2026Latest source Jul 2026Latest event 28 Feb 2025
Last Energy Llynfi PWR-20 proposalMicroreactorUnited KingdomPWR-2020 MWe (gross/net unspecified) · moduleFormer Llynfi Power Station site, South WalesWales · site-area point (approximate)18 Oct 2026Latest source 17 Feb 2025Latest event 17 Feb 2025
Lister Kjernekraft SMR proposal (Lyngdal and Farsund)SMRNorwayDesign profile not linked—Lister region (Lyngdal and Farsund)Agder · region only, no map pin2 Oct 2026Latest source 17 Dec 2025Latest event: none dated
Narvik Kjernekraft SMR plant proposal at Fornes, BallangenSMRNorwayDesign profile not linked—Fornes, Ballangen (Narvik)Nordland · site-area point (approximate)2 Oct 2026Latest source 25 Aug 2025Latest event: none dated
Natura MSR-100 proposal at Texas A&M-RELLISSMRUnited StatesNatura MSR-100—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
newcleo / JAVYS LFR-AS-200 study at Bohunice V1SMRSlovakiaLFR-AS-200—Bohunice V1 siteTrnava · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-VéronSMRFranceLFR-AS-3030 MWe (gross/net unspecified) · plantBeaumont-en-Véron / Savigny-en-VéronIndre-et-Loire · town named, no map pin6 Oct 2026Latest source: none datedLatest event 30 Sep 2026
Norsk Kjernekraft SMR proposal in VardøSMRNorwayDesign profile not linked—Svartnes, VardøFinnmark · town-level point (approximate)2 Oct 2026Latest source, document dated 11 Dec 2024Latest event 22 Nov 2024
Oklo Aurora at Eielson AFB (DAF microreactor pilot)MicroreactorUnited StatesAurora—Eielson Air Force BaseAlaska · site-area point (approximate)7 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora campus, Pike County, OhioMicroreactorUnited StatesAurora—Pike County / former Portsmouth site (Oklo)Ohio · site-area point (approximate)10 Oct 2026Latest source 12 Nov 2026Latest event 1 Feb 2024
OSGE Dąbrowa Górnicza BWRX-300 proposalSMRPolandBWRX-300—Dąbrowa Górniczatown-level point (approximate)1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Kraków / Nowa Huta BWRX-300 proposalSMRPolandBWRX-300—Nowa Huta, Krakówtown-level point (approximate)1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Ostrołęka BWRX-300 proposalSMRPolandBWRX-300—Ostrołękatown-level point (approximate)2 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Stalowa Wola BWRX-300SMRPolandBWRX-300300 MWe (net) · moduleStalowa Wola SMR areaSubcarpathian · town-level point (approximate)2 Oct 2026Latest source 5 Nov 2025Latest event: none dated
OSGE Stawy Monowskie BWRX-300SMRPolandBWRX-300300 MWe (net) · moduleStawy Monowskie near Oswiecim SMR areaLesser Poland · town-level point (approximate)1 Oct 2026Latest source 22 Oct 2026Latest event: none dated
OSGE Wloclawek BWRX-300SMRPolandBWRX-300300 MWe (net) · moduleWloclawek BWRX-300 project areaKuyavian-Pomeranian · town-level point (approximate)2 Oct 2026Latest source 22 Oct 2026Latest event: none dated
Øygarden / Alver SMR proposalSMRNorwayDesign profile not linked—Øygarden and Alvertown named, no map pin1 Oct 2026Latest source 8 Aug 2024Latest event: none dated
Radiant Kaleidos Buckley Space Force Base proposalMicroreactorUnited StatesKaleidos—Buckley Space Force Base, AuroraColorado · site-area point (approximate)10 Oct 2026Latest source 23 Jul 2026Latest event 23 Jul 2026
Rolls-Royce SMR Dětmarovice candidate locationSMRCzechiaRolls-Royce SMR—Dětmarovice candidate locationsite-area point (approximate)28 Oct 2026Latest source 27 Feb 2023Latest event 21 Jul 2026
Rolls-Royce SMR Tušimice candidate locationSMRCzechiaRolls-Royce SMR—Tušimice candidate locationsite-area point (approximate)28 Oct 2026Latest source 22 Dec 2025Latest event 21 Jul 2026
Rolls-Royce SMR WylfaSMRUnited KingdomRolls-Royce SMR1410 MWe (net) · plantWylfa Newydd siteWales · site-area point (approximate)6 Oct 2026Latest source 24 Sep 2026Latest event 13 Apr 2026
SaskPower Rafferty SMR (Estevan area)SMRCanadaBWRX-300600 MWe (net) · plantRafferty site near EstevanSaskatchewan · town-level point (approximate)1 Oct 2026Latest source: none datedLatest event: none dated
SEALER power plant proposal in Longyearbyen, SvalbardSMRNorwaySEALER—LongyearbyenSvalbard · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Shandong Haiyang integrated small reactor demonstration project (heat only)SMRChinaDesign profile not linked200 MWth (thermal only; nameplate; basis unspecified)Haiyang nuclear power plant, south-west cornerShandong · site-area point (approximate)6 Oct 2026Latest source: none datedLatest event 10 Sep 2024
Shelf-M small nuclear plant at the Sovinoe deposit, ChukotkaSMRRussiaSHELF-M10 MWe (gross/net unspecified) · plant · 35 MWth (nameplate; basis unspecified)Sovinoe gold depositChukotka · named site, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
SINAP small modular thorium molten-salt research reactor (10 MWe), MinqinSMRChinaSINAP small modular thorium molten-salt research reactor (10 MWe)10 MWe (gross/net unspecified) · plant · 30 MWth (nameplate; basis unspecified)SINAP Wuwei campus, Hongshagang zone, Minqin countyGansu · site-area point (approximate)6 Oct 2026Latest source 12 Mar 2026Latest event Jan 2026
SPIC Jiamusi nuclear heating demonstration (Hongxing site)SMRChinaDesign profile not linked200 MWth (thermal only; nameplate; basis unspecified)Hongxing site, Simajia town, Huachuan county (Jiamusi)Heilongjiang · site-area point (approximate)3 Oct 2026Latest source 9 Dec 2019Latest event: none dated
Taftøy Aure / Heim SMR proposalSMRNorwayDesign profile not linked—Taftøy Næringspark, Aure and Heimnamed site, no map pin2 Oct 2026Latest source 10 Apr 2026Latest event 11 Feb 2026
Tarapur BSMR-200 lead proposalSMRIndiaBharat Small Modular Reactor (BSMR-200)220 MWe (gross/net unspecified) · moduleTarapurMaharashtra · site-area point (approximate)6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Aug 2026
Tarapur SMR-55 lead proposalSMRIndiaBARC SMR-5555 MWe (gross/net unspecified) · moduleTarapurMaharashtra · site-area point (approximate)6 Oct 2026Latest source 16 Oct 2026Latest event 4 Feb 2026
Temelin Rolls-Royce SMRSMRCzechiaRolls-Royce SMR470 MWe (net) · moduleTemelin SMR early-works areaSouth Bohemian Region · site-area point (approximate)2 Oct 2026Latest source 9 Oct 2026Latest event Oct 2026
Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerMicroreactorUnited StatesSOLO—Rock City Admiral Parkway, ValmeyerIllinois · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Terrestrial Energy IMSR at Texas A&M-RELLISSMRUnited StatesIMSR (Integral Molten Salt Reactor)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 18 Jun 2026
Thorcon 500, Kelasa IslandSMRIndonesiaThorcon 500 (TMSR500)500 MWe (gross/net unspecified) · plantKelasa Island (Pulau Gelasa)Bangka Belitung Islands · site-area point (approximate)6 Oct 2026Latest source: none datedLatest event 30 Jul 2025
U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)MicroreactorCanadaU-Battery—Chalk River Laboratories campus (U-Battery siting bid)Ontario · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Valar Carbon County nuclear campus proposal (Project Beehive)SMRUnited StatesDesign profile not linked—Valar Carbon County campus siteUtah · named site, no map pin13 Oct 2026Latest source, document dated 17 Sep 2026Latest event: none dated
Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals)SMRSwedenRolls-Royce SMR1410 MWe (gross/net unspecified) · plantVärö peninsula next to RinghalsHalland · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event 25 Jun 2026
Westinghouse eVinci at Malmstrom Air Force Base (ANPI)MicroreactorUnited StateseVinci—Malmstrom Air Force BaseMontana · site-area point (approximate)10 Oct 2026Latest source 23 Apr 2026Latest event: none dated

Research coverage for the 65 matching projects: of 585 answers to nine review questions, 263 have a supported statement, 292 were reviewed with a stated limit and 30 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker1253000065
Contractor1649000065
Funding2045000065
Project fuel commitment659000065
Comparable schedule revision262010065
Permissions and public process604000165
Site dependencies (land, grid, water)586000165
Spent fuel, waste and closure26130002665
Next decision and prerequisites630000265
All nine questions26329101030585