Projects / Norway · Siting
Grenland Kjernekraft SMR proposal at Herre, Bamble
Grenland Kjernekraft, a Norsk Kjernekraft subsidiary, proposes a plant of small modular reactors totalling up to 1,500 MW in Norway.
Current status
- How current
- General record check . Bounded evidence review . None of the 5 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
It sent a notification with a proposed impact-assessment program to the Energy Ministry on 27 August 2025. It points to an unregulated area at Herre in Bamble, south of the Skien port terminal, while other localities will also be assessed. Assessment work began in April 2026. No technology is selected and the capacity figure is not stored.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Norsk Kjernekraft
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Herre, Bamble (Grenland) · Norway · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate location from the notification's Table 1-1: 59°07′05.2″N, 9°33′11.8″E, property 1/11. This is a starting location for assessment, not a site approval; alternative locations in Grenland remain under consideration. - Coordinates
- 59.118111, 9.553278 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 3 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Grenland Kjernekraft SMR proposal at Herre, Bamble is recorded at Herre, Bamble (Grenland), Telemark, Norway. Operator: Norsk Kjernekraft. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: Grenland Kjernekraft: notification and proposed assessment programme (PDF), Notification Table 1-1: 59°07′05.2″N, 9°33′11.8″E, property 1/11
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorNorsk Kjernekraft
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025); Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government
- Contractor
The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025)
- Funding and government decisions
The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Taftøy assessment programme set by the government
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Grenland Kjernekraft: notification and proposed assessment programme (PDF)
- Comparable schedule revision
Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Norsk Kjernekraft: Taftøy assessment programme set by the government; Norsk Kjernekraft: locations (ten project companies)
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes)
- Evidence review. The proposal is up to 1,500 MW; no fixed module count is established. Herre in Bamble is a candidate area and alternatives remain; not a finally approved reactor parcel. A Holtec image is explicitly an illustration and does not establish selection of SMR-300. Grenland Kjernekraft is a wholly owned Norsk Kjernekraft project company/filer; municipal ownership invitations do not establish completed ownership or operating appointments. The 27 August 2025 company account reports a notification and proposed assessment program, not construction permission. A Grenland-specific adopted program or dated next ministry decision is not established. Company studies using Aure/Heim’s framework do not establish that decision. Last checked 20 Oct 2026. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026)
What would change this
A project-specific adopted assessment program, final site/design selection or permission instrument; preserve the distinction between proposal and approval. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The notice says the plant would consist of small modular reactors. It names no model. Last checked 19 Oct 2026. Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025)
What would change this
Grenland Kjernekraft names a reactor model. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed. Grenland Kjernekraft's notification identifies property 1/11 on the south side of Vollsfjorden at Herre, Bamble, as the starting location for further assessment, with approximate coordinates 59°07′05.2″N, 9°33′11.8″E. Alternative locations in Grenland remain under consideration. Last checked 26 Oct 2026. Grenland Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
A planning or assessment decision selecting or changing the proposed Herre site or its alternatives. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The next formal step is for the authorities to hold the hearing on the 2025 notification and set Grenland's own impact-assessment program. In April 2026 the company began work early, starting with decommissioning topics, on the framework set for Aure and Heim. No date for setting the program is given. Last checked 23 Oct 2026. Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026)
What would change this
The ministry's decision setting Grenland's assessment program. Next scheduled check: 21 Jan 2027.
- Permissions and public process. Norsk Kjernekraft sent a notification with a proposed impact-assessment program for Grenland to the Energy Ministry in August 2025. The notification describes it as the first of several regulatory steps, followed by a public hearing and the authorities setting the program. In April 2026 the company began assessment work using the framework set for the separate Aure and Heim project. No license or adopted program for Grenland is recorded. Last checked 23 Oct 2026. Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026); Grenland Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
The ministry's hearing or decision setting Grenland's impact-assessment program. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). The 2025 notification says Statnett's Grenland transformer station is 4.5 km west of the candidate area, lists other connection options to be assessed, and expects cooling water from Vollsfjorden/Frierfjorden, possibly with cooling towers, with the method still to be studied. These are assessment proposals, not secured grid, water or land arrangements. Last checked 23 Oct 2026. Grenland Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
An adopted assessment program, impact assessment or grid-connection agreement for the Grenland site. Next scheduled check: 21 Jan 2027.
- Spent fuel, waste and closure. The 2025 notification says a facility for permanent waste storage is not part of this proposal, pointing instead to a separate waste-facility notification from Halden Kjernekraft. In April 2026 Grenland Kjernekraft said its first assessment phase would focus on decommissioning, including radioactive material and how costs and responsibility are covered over the plant's life. No storage, disposal or funding arrangement is established. Last checked 23 Oct 2026. Grenland Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026)
What would change this
An impact assessment or license application naming spent-fuel, waste and decommissioning responsibility. Next scheduled check: 21 Jan 2027.
Evidence dates
(0 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- Norsk Kjernekraft: Grenland assessment proposal sent to the Energy Ministry (27 Aug 2025) (company, accessed 3 Oct 2026)
- Norsk Kjernekraft: Grenland Kjernekraft starts assessment work (24 Apr 2026) (company, accessed 3 Oct 2026)
- Norsk Kjernekraft: locations (ten project companies) (company, accessed 3 Oct 2026)
- Grenland Kjernekraft: notification and proposed assessment programme (PDF) (company, accessed 21 Oct 2026)
- Norsk Kjernekraft: Taftøy assessment programme set by the government (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Grenland Kjernekraft SMR proposal at Herre, Bamble — https://smrmap.com/projects/grenland-smr/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Grenland Kjernekraft SMR proposal at Herre, Bamble”. Record reviewed 3 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/grenland-smr/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.