Projects / prj-gs-energy-uljin
GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complex
GS Energy says it is pursuing SMR construction within the Uljin Nuclear Hydrogen National Industrial Complex. Its May 2023 memorandum with Uljin County was to assess the feasibility of introducing NuScale SMRs there. This is a site-specific proposal at feasibility stage, not a firm order or an approved plant. No module count, project capacity, selected parcel, permission, construction start or operating date is stated. The 77 MW module illustration on the company page is generic and is not stored as project capacity. GS Energy's eventual operating role is not stated. No pin is shown.
What this record says
Last verified 2026-10-08. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
Site and deployment
GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complex is recorded at Uljin Nuclear Hydrogen National Industrial Complex, North Gyeongsang, South Korea. Operator: No operator is recorded. Vendor for a linked design: No selected-design vendor is recorded. Stage: Announced. Location precision: undisclosed.
Capacity
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Permission recorded
- No project-specific regulatory action is recorded here. This is not a finding that no permission exists.
Latest supported development
No actual dated development is recorded.
Next documented milestone
No next milestone date is recorded.
Material unknowns
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
View on map and table · Permissions and applications · Sources and check dates
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Uljin Nuclear Hydrogen National Industrial Complex · South Korea · precision: undisclosed
The industrial complex is named, but no project parcel or coordinates are given. No map pin. - Coordinates
- undisclosed / not plotted
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- smr_by_design_class
- Confidence
- medium
- Last verified
- 2026-10-08 (publication/verification date)
Milestones & dated events
- No dated milestones recorded yet.
Regulatory actions
- None recorded in this release.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Sources
- GS Energy green power portfolio: Uljin SMR proposal (company_primary, accessed 2026-10-08)