Kuopion Energia small nuclear district-heating plant
Kuopion Energia's small nuclear plant in Kuopio, Finland, is a heat-only district-heating project at the siting stage.
Current status
- How current
- General record check . Bounded evidence review . 3 of 5 listed sources have a publication or document date recorded here; the newest is 11 Jun 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The environmental impact assessment covers a plant of at most 150 MW thermal with up to four district-heating reactors at Hepomäki or Sorsasalo; the ministry's statement was issued in July 2026. Technology is to be chosen later (Steady Energy has a pre-planning agreement). No electricity output.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Kuopio (Hepomäki or Sorsasalo) · Finland · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown. - Coordinates
- Town named, no map pin
- Electrical capacity
- thermal only (no MWe) · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Kuopion Energia small nuclear district-heating plant is recorded at Kuopio (Hepomäki or Sorsasalo), North Savo, Finland. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: town or locality only; town named, no map pin.
This project is recorded as thermal only (no MWe). Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerKuopion Energia · source
- Customer or offtaker
Source-backed project statement The City of Kuopio's 11 June 2026 statement on the environmental assessment program says heat from the small nuclear plant would be carried by a new transmission link into Kuopion Energia's own district-heating network, and the ministry's 15 April 2026 notice describes the plant as built for district-heat production. The recipient is the proponent's own network. No external heat buyer or electricity offtake is named. City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026); Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Steady Energy and Kuopion Energia sign pre-planning agreement
- Contractor
Source-backed project statement Steady Energy's 28 August 2024 release says Kuopion Energia and Steady Energy signed a one-year pre-planning agreement starting practical work towards an investment decision on an LDR-50 heating plant, with Kuopion Energia making that decision and starting the environmental assessment. This is a preparatory agreement with a prospective supplier, not a construction contract. The 2026 assessment documents name no vendor, and no renewal of the one-year agreement was read. Steady Energy and Kuopion Energia sign pre-planning agreement; Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy
Not found in the sources we checked (3): Funding and government decisions; Fuel; Comparable schedule revision
- Funding and government decisions
Steady Energy's 28 August 2024 release says Kuopion Energia is taking steps towards a final investment decision, and Kuopion Energia's 16 September 2025 resident slides describe Steady Energy's own investors. Neither, nor the 2026 assessment documents, states an amount, investment decision or financing for the Kuopio plant. Steady Energy and Kuopion Energia sign pre-planning agreement; Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
The ministry's 15 April 2026 notice covers handling and interim storage of spent fuel at the site, and Kuopion Energia's 16 September 2025 slides give the LDR-50's two-to-three-year refuelling interval. Neither is a supply arrangement, and no source read names a fuel supplier, fabrication or delivery for the Kuopio plant. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)
- Comparable schedule revision
Comparable schedule revision not established. Steady Energy's 28 August 2024 release gives one target, starting construction in the early 2030s, with an estimated 3.5-year build. The 2026 ministry notice and city statement are assessment steps, and the slides' 2035 date is when the existing Haapaniemi 2 unit's heat must be replaced. No source read restates the construction target, so no revision is shown. Steady Energy and Kuopion Energia sign pre-planning agreement; City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026); Kuopion Energia: small nuclear power resident evening presentation (16 September 2025)
Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes)
- Evidence review. The Ministry of Economic Affairs and Employment's public notice of 15 April 2026 (a copy posted by Kaavi municipality) says Kuopion Energia Oy submitted to the ministry, as contact authority, an environmental impact assessment program for a small nuclear plant producing district heat in Kuopio, with at most four district-heating reactors and a combined thermal output of at most about 150 MW. It lists two site alternatives, Hepomäki about nine kilometers south-west of the city center (VE1) and Sorsasalo about six kilometers north-east (VE2), plus a no-project option, and the City of Kuopio's environment and building board gave its statement on the program on 11 June 2026. Neither 2026 document names a reactor design or vendor; Steady Energy's undated release on a one-year pre-planning agreement (August 2024 per the stored note) says Kuopion Energia is taking steps toward an investment decision for Steady Energy's LDR-50 plant, that Kuopion Energia makes the investment decision and that locations would be refined in the EIA. Kuopion Energia is the project proponent; no opened source names an intended licensed operator. The ministry's 17 July 2026 statement on the program could not be opened when checked (access refused), so its reported wording that the technology will be chosen later could not be re-read. The next documentary decision is the EIA report with a site choice, followed by a plant-supplier selection. The heat-only basis, siting stage, open design and two-site status stay, but the stored 150 MWt plant output is the program's 'at most about 150 MW' ceiling and should not be stored as plant output. Last checked 19 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Steady Energy and Kuopion Energia sign pre-planning agreement
What would change this
Kuopion Energia's EIA report and the ministry's reasoned conclusion, which would select Hepomäki or Sorsasalo, followed by a published plant-supplier choice naming the reactor design. Next scheduled check: 19 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The 2026 EIA-program notice and the city's 11 June 2026 statement describe a plant of at most four district-heating reactors and at most about 150 MW without naming any design or vendor. Kuopion Energia's 16 September 2025 resident-evening slides list negotiations with plant suppliers (plural) as EIA work. Steady Energy's 2024 release ties the one-year pre-planning agreement to its LDR-50, but no 2026 document records a design selection, and the ministry statement that reportedly leaves technology open could not be opened when checked (access refused). Last checked 19 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; Kuopion Energia: small nuclear power resident evening presentation (16 September 2025); Steady Energy and Kuopion Energia sign pre-planning agreement; TEM statement on Kuopion Energia small nuclear plant EIA programme
What would change this
Kuopion Energia's EIA report or a plant-supplier selection announcement naming the reactor design; a readable copy of the ministry's 17 July 2026 statement would confirm whether the program leaves the technology open. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The ministry's notice and the city's statement name two alternative plant sites, Hepomäki (about 9 km south-west of the center) and Sorsasalo (about 6 km north-east), and no source records a choice between them. The site therefore stays unselected; the stored two-site record is correct and has no single map point. Last checked 19 Oct 2026. City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026); Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy
What would change this
Kuopion Energia's EIA report or a city detailed-plan (asemakaava) decision choosing Hepomäki or Sorsasalo, which would let the site be recorded. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The April 2026 notice says the ministry would issue its statement on the assessment program within a month of the display ending on 15 June 2026; Kuopio's June 2026 statement looks ahead to the assessment report, which is the next step and will compare the two sites. Technology selection and any license application come later, and no date for the report is given in the sources reviewed. Last checked 23 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026)
What would change this
Publication of Kuopion Energia's EIA report, or a technology or site decision. Next scheduled check: 23 Apr 2027.
- Permissions and public process. A 15 April 2026 notice from the Ministry of Economic Affairs and Employment says Kuopion Energia submitted its environmental assessment program for a district-heating small nuclear plant, put it on public display to 15 June 2026 with a public event on 27 April, and offered neighbouring states participation under the Espoo Convention. Kuopio's environment committee unanimously approved its statement on the program on 11 June 2026. This is the scoping stage of assessment, not a permit. Last checked 23 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026)
What would change this
Publication of Kuopion Energia's EIA report, or a government license application for the plant. Next scheduled check: 23 Apr 2027.
- Site dependencies (land, grid, water). The April 2026 assessment notice compares two sites, each with a plant area of about 10 hectares: Hepomäki, about 9 km south-west of central Kuopio, with a 2.5 km heat line to the district-heat network at Matkus, and Sorsasalo, about 6 km north-east, with a new 11-13 km lakebed heat line across Kallavesi to the Haapaniemi plant. These are alternatives under assessment, not a chosen site or secured land and heat-line arrangements. Last checked 23 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy
What would change this
Kuopion Energia's EIA report or a site decision and local plan for the chosen location. Next scheduled check: 23 Apr 2027.
- Spent fuel, waste and closure. The April 2026 assessment notice says the assessed project includes handling and interim storage of very low, low and intermediate level waste and of spent nuclear fuel on the plant site. Kuopio's June 2026 environment committee statement names waste handling and storage among the project's most significant issues and notes plant waste would be stored before delivery to a disposal site. These describe the assessment's scope; no storage or disposal agreement is shown. Last checked 23 Oct 2026. Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy; City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026)
What would change this
Kuopion Energia's EIA report or license application describing the waste management and disposal arrangement. Next scheduled check: 23 Oct 2027.
Evidence dates
(3 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- TEM statement on Kuopion Energia small nuclear plant EIA programme (government, accessed 2 Oct 2026)
- Steady Energy and Kuopion Energia sign pre-planning agreement (company, accessed 2 Oct 2026)
- Ministry of Economic Affairs and Employment: public notice of Kuopion Energia's district-heating small nuclear plant EIA programme (15 April 2026), municipal copy (government, dated 15 Apr 2026, accessed 19 Oct 2026)
- City of Kuopio environment and building board: statement on Kuopion Energia's small nuclear plant EIA programme (11 June 2026) (government, dated 11 Jun 2026, accessed 19 Oct 2026)
- Kuopion Energia: small nuclear power resident evening presentation (16 September 2025) (company, dated 16 Sep 2025, accessed 19 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Kuopion Energia small nuclear district-heating plant — https://smrmap.com/projects/kuopio-smr-heat/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Kuopion Energia small nuclear district-heating plant”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/kuopio-smr-heat/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.