Projects / Belgium · Announced

LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program)

Technology demonstrator for the EAGLES-300 lead-cooled SMR.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 2 of 5 listed sources have a publication or document date recorded here; the newest is 9 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

The EAGLES roadmap targets LEANDREA in Belgium by 2034, and NEA's 2026 dashboard places it at SCK CEN's site in Mol. Output and licensing status are not established.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
SCK CEN
Vendor for linked design
No selected-design vendor recorded
Location
SCK CEN Mol · Belgium · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the BR3 reactor on the SCK CEN site at Mol (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); site-area point for the research center, not a LEANDREA position.
Coordinates
51.2169, 5.0998 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
low
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program) is recorded at SCK CEN Mol, Antwerp, Belgium. Operator: SCK CEN. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'br3-nuclear-power-plant-3' (51.2169, 5.0998)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Contractor

Source-backed project statement The 10 February 2026 announcement says newcleo is joining the EAGLES consortium, whose partners are Ansaldo Nucleare, ENEA, RATEN and SCK CEN, in contributing to the design and construction of LEANDREA, sharing engineering support as equivalent partners, with SCK CEN to operate it. SCK CEN's 2 October 2026 page says it plans to start construction in 2030 and has begun engaging potential suppliers. These are design and engineering partners, not a construction contract. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Site host or owner
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

SCK CEN's 2 October 2026 page says LEANDREA will demonstrate lead-cooled fast reactor technology, serve as an irradiation facility for materials and fuels, and be used for research into applications other than electricity generation. Neither it nor the 10 February 2026 announcement names a buyer or user of LEANDREA's heat or power. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform

Funding and government decisions

SCK CEN's 2 October 2026 page says the Belgian federal government commissioned SCK CEN to work on LEANDREA, without an amount or funding instrument. The 10 February 2026 announcement says EAGLES and newcleo will share engineering contributions as equivalent partners and states no amount. Its newcleo funding figures concern the company, and its 112 million euro figure is the separate 4ALFRED project. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

SCK CEN's 2 October 2026 page and the 10 February 2026 announcement say LEANDREA will be a test and irradiation facility for fast-reactor materials and fuels. That is the facility's purpose. Neither names a fuel supplier, quantity or delivery for LEANDREA's own core. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform

Comparable schedule revision

Comparable schedule revision not established. The 10 February 2026 announcement says LEANDREA's construction is expected to be completed in 2034, and SCK CEN's 2 October 2026 page says it plans to start construction in 2030. A completion date and a construction-start date are different milestones, so they are not a revision. RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: preparations for construction of LEANDREA take shape

Not recorded in SMRMap's reviewed evidence (2): Reactor supplier; Programs and agreements naming the project
Reactor supplier
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. SCK CEN's page dated 02 October '26 says the Belgian federal government commissioned it to work on LEANDREA and that construction is planned to start in 2030. The page does not state an electrical output or name a construction contract. A February 2026 announcement carried on RATEN's site says LEANDREA will be a research facility on the SCK CEN site and that SCK CEN will operate the installation, and it says newcleo is joining the design and construction. SCK CEN's page dated 09 October '26 says an international pre-licensing program has been underway since 2025. That is early regulator engagement, not a permit to build. The stored operator stays as an intended operator. The commercial 300 MWe figure is a different reactor and is not stored. Last checked 19 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform; SCK CEN: from VENUS to LEANDREA, pre-licensing underway
    What would change this

    A Federal Agency for Nuclear Control decision on LEANDREA, or an SCK CEN notice that construction at Mol has started. Next scheduled check: 19 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The pages call LEANDREA a lead-cooled demonstration and irradiation facility. They do not name a model version or an output for it. The 300 MWe figure is the commercial EAGLES-300 model and is not proposed for this record. Last checked 19 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform
    What would change this

    An SCK CEN design document that names the LEANDREA model and its output. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The October page places LEANDREA in Mol, Belgium. The February announcement places completion at the SCK CEN site and gives 2034 as the target. That is a named center, not a plot. No coordinates are proposed. Last checked 19 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape; RATEN: Last Energy demonstrator on the Mioveni nuclear platform
    What would change this

    An SCK CEN siting notice that names the plot for LEANDREA at Mol. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. SCK CEN's 2 October 2026 article says it plans to start LEANDREA construction in 2030 and is preparing industrial suppliers for the design and construction phase. The articles do not name the licensing decision, actor or date that would have to precede construction. The 2030 start is a plan, not an achieved event. Last checked 23 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape
    What would change this

    A license application or a revised construction-start date for LEANDREA. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. SCK CEN's 2 October 2026 article says it is working on LEANDREA on commission from the Belgian federal government. Its 9 October 2026 article says an international pre-licensing program has run since 2025, with experts from Belgium's regulator FANC, Romania's CNCAN and the IAEA recently visiting SCK CEN facilities. Pre-licensing engagement is not a license application or authorization, and these sources record no public consultation. Last checked 23 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape; SCK CEN: from VENUS to LEANDREA, pre-licensing underway
    What would change this

    A license application to FANC for LEANDREA, or a public consultation or environmental assessment notice. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). SCK CEN's October 2026 article places LEANDREA in Mol, Belgium, as the first of two EU-SMR-LFR demonstration reactors, to be followed by ALFRED in Pitesti, Romania. SCK CEN already operates its Mol site, but the article gives no plot, grid connection, cooling or other infrastructure arrangement for the new reactor. Last checked 23 Oct 2026. SCK CEN: preparations for construction of LEANDREA take shape
    What would change this

    An SCK CEN site plan, permit application or environmental document locating LEANDREA within the Mol site. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(2 of 5 sources with a publication or document date)
Latest dated listed source publication: SCK CEN: from VENUS to LEANDREA, pre-licensing underway: 9 Oct 2026.Latest dated recorded event: no date recorded.3 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program) — https://smrmap.com/projects/leandrea-mol/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 programme)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/leandrea-mol/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.