Projects / Norway · Siting
Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen
Narvik Kjernekraft, owned by Norsk Kjernekraft and Narvik municipality's business company Futurum, proposes an SMR plant at Fornes in Ballangen, Norway.
Current status
- How current
- General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 25 Aug 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Developer or proposer (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
It submitted a notification with a proposed assessment program to the Energy Ministry in September 2025 for the plant, of up to 1,200 MW electric if fully built. The reactor vendor has not been chosen.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Fornes, Ballangen (Narvik) · Norway · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate geolocation stated in Narvik Kjernekraft's 2 September 2025 melding (68.34845 N, 16.89290 E) for the proposed plant location; the exact plot is to be set in the impact assessment. Not a surveyed parcel. - Coordinates
- 68.34845, 16.8929 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen is recorded at Fornes, Ballangen (Narvik), Nordland, Norway. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: Narvik Kjernekraft: melding with proposed assessment programme, Notification of 2 September 2025, stated approximate geolocation 68.34845 N, 16.89290 E
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Parent companyNorsk Kjernekraft · source
- Application filing entityNarvik Kjernekraft AS · source
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: notification and proposed assessment programme (PDF); Narvik Kjernekraft: melding with proposed assessment programme; Norsk Kjernekraft: Futurum and Norsk Kjernekraft establish Narvik Kjernekraft; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Taftøy assessment programme set by the government
- Contractor
The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: melding with proposed assessment programme; Narvik Kjernekraft: notification and proposed assessment programme (PDF)
- Funding and government decisions
The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: melding with proposed assessment programme; Narvik Kjernekraft: notification and proposed assessment programme (PDF); Norsk Kjernekraft: Futurum and Norsk Kjernekraft establish Narvik Kjernekraft; Norsk Kjernekraft: Taftøy assessment programme set by the government
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Narvik Kjernekraft: notification and proposed assessment programme (PDF)
- Comparable schedule revision
Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Narvik Kjernekraft: notification and proposed assessment programme (PDF); Narvik Kjernekraft: melding with proposed assessment programme; Norsk Kjernekraft: Taftøy assessment programme set by the government; Norsk Kjernekraft: locations (ten project companies)
Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(8 notes)
- Evidence review. The notice is a notification and proposed study program, the first formal step, for an SMR plant in Narvik of up to 1,200 MW if fully built, with no selected model and no mention of Fornes. Up to 1,200 MW is not stored. The page dates the item 2 September 2025 and says Narvik Kjernekraft AS, owned by Norsk Kjernekraft and Futurum, filed it. Fornes and Ballangen do not appear in the text. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Narvik Kjernekraft AS submitted the September 2025 notification and proposed assessment program. The recorded role is filing entity. Norsk Kjernekraft remains a parent company; a reactor operator is not established. Last checked 20 Oct 2026. Narvik Kjernekraft: melding with proposed assessment programme
What would change this
An assessment program or later Narvik notice that names a parcel or selects one reactor model. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. Narvik Kjernekraft's 2 September 2025 notification says the final reactor-technology choice will be affected by the impact assessment and describes a reactor-technology assessment still to be done. It lists Holtec SMR-300, NuScale VOYGR and Rolls-Royce SMR as examples of current suppliers. Those examples are not a selected design, so none is linked. Last checked 19 Oct 2026. Narvik Kjernekraft: melding with proposed assessment programme
What would change this
Narvik Kjernekraft or the Energy Ministry names the selected reactor design. Next scheduled check: 19 Jan 2027.
- Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Narvik Kjernekraft: melding with proposed assessment programme
What would change this
A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.
- Developer or proposer: Not disclosed in the reviewed evidence. Narvik Kjernekraft AS submitted the September 2025 notification and proposed assessment program. The recorded role is filing entity. Norsk Kjernekraft remains a parent company; a reactor operator is not established. Last checked 20 Oct 2026. Narvik Kjernekraft: melding with proposed assessment programme
What would change this
A later project-company or official notice defining changed development responsibilities or naming the intended operator. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites. Under the process set out in the September 2025 notification, the next step is a public hearing of the proposed assessment program and a decision by the authorities setting it. The sources reviewed give no date for either. Last checked 23 Oct 2026. Narvik Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
The ministry's hearing notice or decision setting the Narvik program. Next scheduled check: 21 Jan 2027.
- Permissions and public process. Narvik Kjernekraft's notification with a proposed impact-assessment program, dated 2 September 2025, describes itself as the first of several regulatory steps under Norwegian law, to be followed by a public hearing of at least six weeks and the authorities setting the program. The sources reviewed do not show that hearing or an adopted program; no license exists. Last checked 23 Oct 2026. Narvik Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
The ministry's hearing notice or decision setting the Narvik assessment program. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). The September 2025 notification says the plant could connect to Statnett's Ofoten substation along the existing 132 kV Bjørkåsen–Ofoten line route, which would need a supplementary or replacement 420 kV line to export 1,200 MW. The cooling method is still to be assessed. These are proposals for assessment, not secured grid, water or land arrangements. Last checked 23 Oct 2026. Narvik Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
An adopted assessment program, impact assessment or Statnett connection decision for Fornes. Next scheduled check: 21 Jan 2027.
- Spent fuel, waste and closure. The September 2025 notification says permanent waste storage is outside this proposal, that a waste-facility notification is filed by Halden Kjernekraft, and that the two companies would cooperate on waste handling. No storage, disposal or funding arrangement for Narvik is established. Last checked 23 Oct 2026. Narvik Kjernekraft: notification and proposed assessment programme (PDF)
What would change this
An impact assessment or license application describing spent-fuel and waste responsibility for Narvik. Next scheduled check: 21 Jan 2027.
Evidence dates
(1 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- Narvik Kjernekraft: melding with proposed assessment programme (company, accessed 2 Oct 2026)
- Narvik Kjernekraft: notification and proposed assessment programme (PDF) (company, accessed 2 Oct 2026)
- Norsk Kjernekraft: Futurum and Norsk Kjernekraft establish Narvik Kjernekraft (company, published 25 Aug 2025, accessed 2 Oct 2026)
- Norsk Kjernekraft: locations (ten project companies) (company, accessed 3 Oct 2026)
- Norsk Kjernekraft: Taftøy assessment programme set by the government (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen — https://smrmap.com/projects/narvik-fornes/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Narvik Kjernekraft SMR plant proposal at Fornes, Ballangen”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/narvik-fornes/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.