Projects / Norway · Siting

Øygarden / Alver SMR proposal

Impact studies have begun across alternative locations.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 1 of 3 listed sources has a publication or document date recorded here: 8 Aug 2024. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No map pin is shown for this record.
  • State or province is not recorded.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

Rolls-Royce is an assessment reference, not a selected vendor contract. Location, configuration and construction authority remain unconfirmed.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Norsk Kjernekraft
Vendor for linked design
No selected-design vendor recorded
Location
Øygarden and Alver · Norway · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Øygarden / Alver SMR proposal is recorded at Øygarden and Alver, state or province not recorded, Norway. Operator: Norsk Kjernekraft. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: town or locality only; town named, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Contractor

Source-backed project statement The reviewed release describes Rolls-Royce assessment and cooperation, alongside Blykalla’s separately reported industrial relationship. Neither establishes a selected vendor or EPC award. The Aker/Rolls-Royce test program on Norway’s west coast is not an Øygarden construction contract. Norsk Kjernekraft Øygarden assessment; Norsk Kjernekraft: locations (ten project companies)

Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment; Norsk Kjernekraft: locations (ten project companies)

Funding and government decisions

The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft Øygarden assessment

Not recorded in SMRMap's reviewed evidence (3): Reactor supplier; Site host or owner; Programs and agreements naming the project
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. Studies have started and are not a license application or a construction decision, and that no design, module count, or coordinates are stored. The same page dates the study start 30 April 2026, names a possible plant in Øygarden, and says Rolls-Royce technology will inform the study. Last checked 20 Oct 2026. Norsk Kjernekraft Øygarden assessment
    What would change this

    The first Øygarden technical report that names a site parcel or a reactor model. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The Øygarden notice starts technical studies for a possible plant and a future license application. It does not select a reactor model. A separate Aker Solutions and Rolls-Royce component item on the page is not an Øygarden vendor contract. Last checked 19 Oct 2026. Norsk Kjernekraft Øygarden assessment
    What would change this

    Øygarden Kjernekraft names a reactor vendor or model for this project. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The notice concerns a possible plant in Øygarden. It publishes no parcel or facility point. Last checked 19 Oct 2026. Norsk Kjernekraft Øygarden assessment
    What would change this

    An Øygarden notice that identifies a parcel or alternative sites by property designation. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. Øygarden Kjernekraft's April 2026 release describes assessment reports that would underpin a future license application, starting with non-proliferation and safeguards. It gives no date for the authorities to set the project's own assessment program or for an application. Last checked 23 Oct 2026. Norsk Kjernekraft Øygarden assessment
    What would change this

    The ministry's decision on the Øygarden assessment program, or a license application. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. The April 2026 release says Norsk Kjernekraft previously sent the Energy Ministry a notification with a proposed impact-assessment program for Øygarden, and that Øygarden Kjernekraft has begun technical reports toward a future license application, using the framework set for the separate Aure and Heim project. No license application, adopted program or consultation outcome for Øygarden is recorded. Last checked 23 Oct 2026. Norsk Kjernekraft Øygarden assessment
    What would change this

    The ministry's hearing or decision setting the Øygarden assessment program, or a license application. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). World Nuclear News reported on 8 August 2024 that Norsk Kjernekraft's notification proposed an area of up to 101 hectares at Buneset, 600 metres south of the transformer and gas-processing plant at Kollsnes, described as well suited to existing and planned grid infrastructure around Bergen. That is a proposed location for assessment; no land, grid-connection or cooling-water agreement is described. Last checked 23 Oct 2026. Third nuclear power plant proposal lodged in Norway
    What would change this

    An adopted assessment program or impact assessment describing the Buneset site and its connections. Next scheduled check: 21 Jan 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 3 sources with a publication or document date)
Latest dated listed source publication: Third nuclear power plant proposal lodged in Norway: 8 Aug 2024.Latest dated recorded event: no date recorded.2 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Øygarden / Alver SMR proposal — https://smrmap.com/projects/oygarden-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Øygarden / Alver SMR proposal”. Record reviewed 1 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/oygarden-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.