Projects / China · Canceled
Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)
The Shenyang 2 x 200 MW nuclear heating project (NHR200-I) in China is a historical heat-only proposal that has ended.
Current status
- How current
- Record checked · Evidence reviewed · Next recheck due
Development and review dates
Newest recorded development . 2 of 4 listed sources have a publication or document date recorded here; the newest is 2024. Status not rechecked since the record check; this project is not covered by the nightly status check. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Apr 2001 · Recorded development: Shenyang nuclear heating project: state approval of the project proposal. INET states the 2 x 200 MW project proposal received state approval in April 2001. Source: INET, Tsinghua University: NHR200 low-temperature heating reactor page. Updates entry
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Not yet recorded for this stage: Design identified; Developer or proposer (not stated in the sources read). Not recorded does not mean zero or that none exists; the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
INET's NHR200 page states that the Shenyang 2 x 200 MW nuclear heating project received state approval of its project proposal in April 2001; no later construction or licensing evidence was found in the regulator's 2018 to 2026 document lists, and earlier lists were not read. A 2024 conference paper by INET authors says drastic changes of investor and weak economic competitiveness led to the project's termination; it gives no date or formal instrument. The site within Shenyang is not established, and the April 2001 approval rests on a single developer source. A January 2001 trade report said the city would raise USD 170 million for the two reactors, a planned amount rather than money spent. Two 200 MWt heating reactors are the described configuration; no plant total is stored. The NHR-200 heating reactor design is documented in IAEA-TECDOC-965 among small reactor designs (the document behind the Daqing NHR-200 record), and INET describes its successor NHR200-II as a small modular reactor; that documented design identity, with the named host city and dated state approval, is the historical basis for inclusion. No design profile is linked because INET's page describes the NHR200 family without a profile document.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Shenyang (site not stated) · China · precision: town or locality only
INET names the host city only; no parcel is published and no pin is shown. - Coordinates
- Town named, no map pin
- Electrical capacity
- thermal only (no MWe) · scope: plant
- Thermal capacity
- Not recorded
- Record reviewed
- 6 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001) is recorded at Shenyang (site not stated), Liaoning, China. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Canceled. Location precision: town or locality only; town named, no map pin.
This project is recorded as thermal only (no MWe). Modules planned: 2. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Funding and government decisions
Source-backed project statement A January 2001 Nuclear Engineering International news report says the city of Shenyang would raise USD 170 million to build two 200 MW low-temperature heating reactors developed by Tsinghua University, the project whose proposal INET says received state approval in April 2001. That is a reported planned amount before approval, not money raised, appropriated or spent; no financing instrument, lender or disbursement is recorded. China to have nuclear-heated city; INET, Tsinghua University: NHR200 low-temperature heating reactor page
Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
- Customer or offtaker
Tsinghua University INET's NHR200 page says the Shenyang 2 x 200 MW nuclear heating project received state approval of its project proposal in April 2001. The page names no heat utility or other recipient of the project's heat. INET, Tsinghua University: NHR200 low-temperature heating reactor page
- Contractor
Tsinghua University INET's NHR200 page says INET promoted its NHR200-I heating reactor and that the Shenyang 2 x 200 MW project's proposal was approved in April 2001. INET is the design developer, and the page names no engineering or construction contractor for Shenyang. INET, Tsinghua University: NHR200 low-temperature heating reactor page
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
Tsinghua University INET's NHR200 page describes the NHR200 heating reactor family and the Shenyang approval but names no fuel supplier or delivery for Shenyang. INET, Tsinghua University: NHR200 low-temperature heating reactor page
- Comparable schedule revision
Comparable schedule revision not established. Tsinghua University INET's NHR200 page dates only the April 2001 approval of the Shenyang project proposal and gives no construction or operation target. The December 1996 construction license on the same page is for the 200 MW design generally and does not name Shenyang. There is no target to revise. INET, Tsinghua University: NHR200 low-temperature heating reactor page
Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Recorded development
Shenyang nuclear heating project: state approval of the project proposal
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. INET's NHR200 page says that, in the promotion of the 200 MW NHR200-I heating reactor, the Shenyang 2×200 MW nuclear heating project received state approval of its project proposal in April 2001. A December 1996 construction-license sentence on the same page does not name Shenyang and is not used for this project. The 2003 Shandong desalination approval is a different project. The IAEA TECDOC capture does not contain the word Shenyang. Two units are already stored. 200 MW is not written as a plant total, and 400 MW is not calculated. The site within Shenyang is not stated. Last checked 20 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
A regulator notice that names a Shenyang site, a construction license for this project, or a later decision that it stopped. Next recheck due .
- Design identified. INET's historical account identifies the terminated Shenyang heating project within its NHR200-I program. NHR200-II is described separately and is not assigned to Shenyang; no NHR200-I profile is presently linked. Last checked 26 Oct 2026. INET, Tsinghua University: Characteristics, Development, and Applications of the NHR200-II Reactor in Non-Electric Energy Systems (IAEA SMR conference paper, 2024)
What would change this
A technical or project document clarifying the historical NHR200-I variant for a separately reviewed design profile. Next recheck due .
- Developer or proposer: Not disclosed in the reviewed evidence. INET is identified as the reactor-line designer/promoter. The Shenyang sentence names no project company, reactor operator or local project proposer; none is inferred from page authorship. Last checked 20 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
A later notice that names a different developer for Shenyang. Next recheck due .
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The page names Shenyang and does not name a district, plant, or coordinates. The stored location names only the city. The TECDOC does not name Shenyang. Last checked 20 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
A siting notice that places the heating plant inside Shenyang. Next recheck due .
- Permissions and public process. Tsinghua INET's NHR200 page says the Shenyang 2 x 200 MW nuclear heating project received state approval of its project proposal in April 2001. Project-proposal approval is an early planning step, not a nuclear license; the page records no siting, construction or operating license for Shenyang, and no later step is shown in the sources reviewed. Last checked 23 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
An NNSA license record or contemporaneous document on the Shenyang heating project after 2001. Next recheck due .
- Site dependencies (land, grid, water). A January 2001 Nuclear Engineering International news report says Shenyang would build two 200 MW low-temperature heating reactors developed by Tsinghua University, with a total heating area of 10 million square metres, about one seventh of the city's heated area. That describes the intended district-heating load only. The report names no site within Shenyang, land, heat-network connection agreement or cooling arrangement, so no secured site arrangement is established. Last checked 23 Oct 2026. China to have nuclear-heated city
What would change this
A feasibility report, site approval or city heating-network document naming the plant site and its connection to Shenyang's heating system. Next recheck due .
- Next decision and prerequisites: Not applicable. A 2024 paper by authors from Tsinghua University's Institute of Nuclear and New Energy Technology, the NHR200 designer, written for the IAEA's October 2024 small modular reactor conference, says the central government approved the Shenyang nuclear heating project's preliminary work in 2001, but that drastic changes of investor and weak economic competitiveness led to the termination of the project. No further development decision is identified for that terminated proposal. The paper gives no termination date or formal cancellation document; this does not settle any residual obligations. Last checked 23 Oct 2026. INET, Tsinghua University: Characteristics, Development, and Applications of the NHR200-II Reactor in Non-Electric Energy Systems (IAEA SMR conference paper, 2024)
What would change this
A dated government or developer document reviving the Shenyang nuclear heating project. Next recheck due .
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(2 of 4 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(4)
- INET, Tsinghua University: NHR200 low-temperature heating reactor page (company, accessed 6 Oct 2026)
- IAEA-TECDOC-965: Design approaches for heating reactors (IAEA/NEA, accessed 2 Oct 2026)
- China to have nuclear-heated city (news report, published 12 Jan 2001, accessed 23 Oct 2026)
- INET, Tsinghua University: Characteristics, Development, and Applications of the NHR200-II Reactor in Non-Electric Energy Systems (IAEA SMR conference paper, 2024) (academic, published 2024, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001) — https://smrmap.com/projects/shenyang-nhr200-2001/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)”. Record reviewed 6 Oct 2026. https://smrmap.com/projects/shenyang-nhr200-2001/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Proposal from an earlier SMR program
- Confidence (as stored in the record)
- low