Projects / prj-ucri-ien

UCRI critical unit for the Brazilian microreactor programme at IEN

Planned critical test reactor at IEN’s Argonauta building in Rio de Janeiro, separate from the existing Argonauta reactor and from a commercial microreactor deployment. IEN is responsible for implementation, commissioning and operation. CNEN reports that IEN sent a letter to ANSN on 2 December 2025 seeking permission to construct the critical unit and conduct tests at Argonauta. The letter itself was not opened; acceptance and authorization are not established. CNEN describes power at the scale of 100 W without an explicit thermal/electrical basis, so no numeric rating is assigned. The 9 December ceremony was a licensing event, not evidence of physical construction. The programme’s commercial design relationship to HARPIA and conflicting 5 MWth/5 MWe descriptions remains unresolved.

What this record says

Last verified 2026-10-13. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Site and deployment

UCRI critical unit for the Brazilian microreactor programme at IEN is recorded at IEN Argonauta building, UFRJ campus, Rio de Janeiro, Rio de Janeiro, Brazil. Operator: Instituto de Engenharia Nuclear (IEN/CNEN). Vendor for a linked design: No selected-design vendor is recorded. Stage: Licensing. Location precision: undisclosed. Other documented relationships: Project proposer: Diamante Energia.

Capacity

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Permission recorded

Latest supported development

No actual dated development is recorded.

Next documented milestone

No next milestone date is recorded.

Material unknowns

Stage
Licensing
Design
Design profile not linked (Microreactor)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Instituto de Engenharia Nuclear (IEN/CNEN)
Vendor for linked design
No selected-design vendor recorded
Other documented relationships
Location
IEN Argonauta building, UFRJ campus, Rio de Janeiro · Brazil · precision: undisclosed
Named facility; coordinates not recorded. No map pin.
Coordinates
undisclosed / not plotted
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
—
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-13 (publication/verification date)

Milestones & dated events

Regulatory actions

Construction applications and decisions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Sources