Projects / Norway · Siting

Norsk Kjernekraft SMR proposal in Vardø

Norsk Kjernekraft submitted a proposed assessment program for a nuclear plant in Vardø municipality to the Energy Ministry in June 2024.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 2 of 4 listed sources have a publication or document date recorded here; the newest is 11 Dec 2024. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
22 Nov 2024 · Recorded development: Regional councils report the Energy Ministry's interim reply holding the Vardø assessment program. On 22 November 2024 the Øst-Finnmark and Vest-Finnmark regional councils reported that the Energy Ministry's interim reply of 1 October had put the Vardø assessment program on hold pending the Aure and Heim hearing, and backed the municipality's objection. Source: Øst-Finnmarkrådet and Vest-Finnmark Rådet joint statement on the Vardø nuclear assessment programme (22 November 2024) (dated 22 Nov 2024). Updates entry
More on this development

The event date is the councils' letter date; the ministry's reply was not opened. Subsequent status is not established by these documents; this report grants no project permission.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

The municipality's council had unanimously decided in 2023 to cooperate with Norsk Kjernekraft on an SMR plant. The mayor told the government's nuclear committee in December 2024 that the assessment proposal was under consideration. On 22 November 2024 two Finnmark regional councils reported that the ministry's interim reply of 1 October had put the Vardø process on hold pending the Aure and Heim hearing. The ministry's reply itself was not opened; subsequent status is not established by these documents. Technology, capacity and the operator are not established.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Svartnes, Vardø · Norway · precision: town or locality only
Town point from the Wikipedia article for Svartnes; the proposal names Svartnes in Vardø. No parcel point is published, so this is a town-level point.
Coordinates
70.35861, 31.03083 · town-level point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Norsk Kjernekraft SMR proposal in Vardø is recorded at Svartnes, Vardø, Finnmark, Norway. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: town or locality only; town-level point (approximate).

Coordinate source: Wikipedia: Svartnes (article coordinates), Article coordinate 70.35861, 31.03083 on 'Svartnes', read 30 October 2026

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Vardø municipality: mayor's summary to the government nuclear committee (11 December 2024), hosted on regjeringen.no; Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Norsk Kjernekraft: locations (ten project companies)

Contractor

The reviewed sources do not establish an additional project-specific engineering, preparatory-work or construction assignment. A supplier’s general capabilities or an industry-wide agreement do not establish a contract for this site. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Norsk Kjernekraft: locations (ten project companies)

Funding and government decisions

The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: locations (ten project companies); Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø)

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø)

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Teknisk Ukeblad: melder inn nytt kjernekraftverk til regjeringen (Vardø); Øst-Finnmarkrådet and Vest-Finnmark Rådet joint statement on the Vardø nuclear assessment programme (22 November 2024); Vardø municipality: mayor's summary to the government nuclear committee (11 December 2024), hosted on regjeringen.no

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(2 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated listed source document: Vardø municipality: mayor's summary to the government nuclear committee (11 December 2024), hosted on regjeringen.no: 11 Dec 2024.Latest dated recorded event: Regional councils report the Energy Ministry's interim reply holding the Vardø assessment program: 22 Nov 2024.2 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Norsk Kjernekraft SMR proposal in Vardø — https://smrmap.com/projects/vardo-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Norsk Kjernekraft SMR proposal in Vardø”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/vardo-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.