Companies / org-appalachian-power
Appalachian Power
American Electric Power operating subsidiary assessing the Joshua Falls property in Campbell County, Virginia, for a possible SMR. It is the company named for the site work; a future reactor operator and technology are not established.
- Roles
- Utility
- Organization type
- utility
- Country
- United States
- Aliases
- —
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
AEP names Appalachian Power as an operating subsidiary. AEP's public share listing is not assigned to this subsidiary; separate ownership and listing details were not opened. - Confidence
- high
- Last verified
- 2026-10-08
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 siting. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- AEP Joshua Falls SMR proposal — Siting · United States
Recorded link: project proposer · project record checked 2026-10-09 · permission status · sources
Ownership & relationships
- American Electric Power — parent of Appalachian Power (operating subsidiary) · as of 2025-01-17. AEP's source identifies Appalachian Power as its operating company for the Joshua Falls proposal.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- AEP potential new SMR sites (company_primary, accessed 2026-10-10)
- Virginia SCC final order, Case No. PUR-2025-00085 (government_primary, accessed 2026-10-04)