Blue Energy
Blue Energy Global Inc. is the controlling applicant and, according to its public non-proprietary Construction Permit Application Part 1 Enclosure 9, the intended operator of Port of Victoria Nuclear Unit 1. The same applicant filing describes Sister 1 LLC as its wholly owned special-purpose project owner through Blue Energy DevCo LLC and River 1 LLC as of 15 September 2026. These are planned roles in an application under acceptance review, not evidence of an operating reactor or an issued license. GE Vernova Hitachi Nuclear Energy Americas is the BWRX-300 designer; Blue Energy is not identified as the reactor designer. The filing calls Blue Energy privately owned; no exchange listing was opened.
- Projects
- Licensing: Blue Energy BWRX-300 at Port of Victoria.
- Evidence
- 4 sources; first primary source: Blue Energy letter submitting Construction Permit Application Part 1 (ADAMS ML26258A339). Record reviewed 9 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved · Headlines naming this company (1)
Key facts
- Organization type
- Project proposer, Operator
- Category
- other
- Country
- United States
- Listing status
- Privately held · source Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376) · listing checked 6 Nov 2026
- Ownership / control
- Private
Blue Energy Global Inc. described itself as privately held in sections 2.1.1 and 2.1.5 of its 15 September 2026 non-proprietary application. This classification concerns the applicant, not its Sister 1 project subsidiary, and is an applicant statement, not an NRC finding. Listing check on 6 November 2026 reused the saved filing; it does not establish a license or a later ownership change. - Website
- https://www.blueenergy.co/
- Confidence
- medium
- Record reviewed
- 9 Oct 2026 (record review date, not proof of current activity)
All fields
(2 without a known value)
- Aliases
- None recorded in this release
- Exchange / ticker
- None recorded in this release
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project record: 1 licensing, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Blue Energy BWRX-300 at Port of Victoria — Licensing · United States
Recorded link: operator/host field, project proposer, application filing entity, parent company · project record checked 18 Oct 2026 · timeline · 1 recorded project action · sources
Ownership & relationships
- Recorded subsidiary: Sister 1 LLC — that company’s record names Blue Energy as its parent · as of 15 Sep 2026. Construction permit application Part 1, Enclosure 9.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(4)
- Blue Energy letter submitting Construction Permit Application Part 1 (ADAMS ML26258A339) (company, accessed 9 Oct 2026)
- Blue Energy Construction Permit Application Part 1, non-proprietary Enclosure 9 (ADAMS ML26265A376) (company, accessed 18 Oct 2026)
- Blue Energy construction permit application announcement (company, accessed 2 Oct 2026)
- GE Vernova on Blue Energy's Port of Victoria application (company, accessed 2 Oct 2026)