Companies / org-hainan-nuclear-power
Hainan Nuclear Power Company
IAEA PRIS lists Hainan Nuclear Power Company as operator and owner of the Linglong-1 (ACP100) unit at Changjiang, Hainan; NucNet describes it as the project company. Its shareholders are not established here.
- Roles
- Operator
- Organization type
- operator
- Country
- China
- Aliases
- —
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
- Website
- —
- Confidence
- medium
- Last verified
- 2026-10-10
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 commissioning. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Linglong One (ACP100) Changjiang — Commissioning · China
Recorded link: operator/host field · project record checked 2026-10-10 · permission status · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026 (iaea_or_nea, accessed 2026-10-09)
- NucNet: Hot Testing Begins At China’s Linglong-1 Small Modular Reactor (7 October 2026) (reputable_press, accessed 2026-10-09)