Companies / org-huaneng-shidaowan
Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.
NNSA operating licence 国核安证字第2119号 names this company as holder and operating organization of the Shidaowan high-temperature gas-cooled demonstration. IAEA PRIS, captured 9 October 2026, lists the same company as operator of Shidao Bay-1 and China Huaneng Group as owner. Shareholders are not established here.
- Roles
- Operator
- Organization type
- operator
- Country
- China
- Aliases
- 华能山东石岛湾核电有限公司
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
The licence names the company as the operating organization. It does not state the shareholders. - Website
- —
- Confidence
- high
- Last verified
- 2026-10-15
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 operating. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- HTR-PM Shidaowan demonstration — Operating · China
Recorded link: operator/host field · project record checked 2026-10-15 · 1 recorded project action · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119) (regulator_primary, dated 20 Aug 2021, accessed 2026-10-15)
- NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration (regulator_primary, page updated 29 Mar 2023, accessed 2026-10-15)
- IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026 (iaea_or_nea, accessed 2026-10-09)