HTR-PM Shidaowan demonstration
Twin-module HTGR demonstration plant: two 250 MWth pebble-bed reactor modules drive one turbine (IAEA ARIS: 210 MWe gross for the plant).
Current status
- How current
- General record check . Bounded evidence review . 3 of 9 listed sources have a publication or document date recorded here; the newest is 20 Aug 2021. A listed page was last updated 29 Mar 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
Newest recorded development . Next general check: . Next evidence or detail review: .
- Permissions
- Recorded: NNSA operating license for the Shidaowan HTR-PM demonstration (20 Aug 2021). All permissions and applications
- Latest development
- 6 Dec 2023 · Commercial operation: HTR-PM commercial operation. Commercial operation reported for HTR-PM. Source: China HTR-PM commercial operation reporting; IAEA Power Reactor Information System (PRIS); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026. Updates entry
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
IAEA PRIS lists Shidao Bay-1 as one unit at 500 MWth, 211 MWe gross, 150 MWe net and 200 MWe design net, with grid connection on 14 December 2021 and commercial operation on 6 December 2023. The 210 versus 211 MWe gross difference between the two IAEA records is preserved. NNSA operating license 国核安证字第2119号, issued 20 August 2021 and valid through 19 August 2061, names Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd. as the holder and operating organization for the demonstration (CN-44) at Ningjin Town, Rongcheng, Shandong. First fuel loading is the start of operation. Condition 23 sets control points at 15 percent and 65 percent of plant rated electrical power and states no megawatt figure. PRIS names that company as operator and China Huaneng Group as owner, and lists latestOperatingLicenseDate 15 March 2021. That Member-State date is not the opened license date. The ARIS status report says the plant is designed by INET, Tsinghua University, and that Chinergy was designated main contractor of the nuclear island. Those roles are not a plant vendor. The report does not name China National Nuclear Corporation. The earlier vendor link to that corporation is removed because the opened report, the PRIS unit row and the opened license text do not support it. China Nuclear Engineering Corporation, a December 2004 investment party in the report, is not recorded as China National Nuclear Corporation. PRIS names Tsinghua University as reactor supplier. That supplier label is distinct from the designer and is not stored as the plant vendor. Chinergy is not linked through the organization record that also carries a CNNC Energy Technology name.
Key facts
- Design
- HTR-PM (SMR)
- Technology
- High-temperature gas-cooled reactor (HTGR) · helium
- Vendor for linked design
- —
- Location
- Shidaowan / Shidao Bay · China · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for Shidao Bay unit 1 (HTR-PM; CC BY 4.0, derived from GEM's Global Nuclear Power Tracker). Plant-area point, not a surveyed plot. Replaces an earlier hand-rounded point that had no traceable source. - Coordinates
- 36.9792, 122.5317 · site-area point (approximate)
- Electrical capacity
- 210 MWe (gross) · scope: plant
- Thermal capacity
- 500 MWth (nameplate; basis unspecified)
- Purpose
- Power plant
- Construction start
- 9 Dec 2012HTR-PM construction start (IAEA PRIS)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 19 Oct 2026
Site and capacity notes
HTR-PM Shidaowan demonstration is recorded at Shidaowan / Shidao Bay, Shandong, China. Operator: Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.. Recorded vendor: No vendor is recorded. Stage: Operating. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'shidao-bay-nuclear-power-plant-1' (36.9792, 122.5317)
Recorded electrical output is 210 MWe (gross), scope plant. Modules planned: 2. Recorded thermal output is 500 MWth (nameplate; basis unspecified).
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Parent companyChina Huaneng Group · source
- Operator or intended licensed owner
- OperatorHuaneng Shandong Shidao Bay Nuclear Power Company, Ltd.
- Intended licensed ownerHuaneng Shandong Shidao Bay Nuclear Power Company, Ltd. · source
- Contractor
- Construction contractorChina Nuclear Engineering Corporation (CNEC) · sourceDescribed as plant constructor; installed the first reactor pressure vessel in March 2016.
- Construction contractorChinergy / CNNC Energy Technology · sourceMain contractor for the nuclear island; a joint venture of Tsinghua University and CNEC (2016).
Source-backed project statement
The IAEA HTR-PM status report published on 11 October 2024 says Chinergy Company was designated the main contractor of the HTR-PM nuclear island, and that the owner company was founded in January 2007. The same report's milestone list says the owner was established in 2006 by China Huaneng Group, China Nuclear Engineering Group and Tsinghua University. The designation states no contract price and no conventional-island contractor. IAEA ARIS status report: HTR-PM (China)
- Funding and government decisions
Source-backed project statement The IAEA HTR-PM status report published on 11 October 2024 says a preliminary investment agreement was signed in December 2004 by China Huaneng Group, China Nuclear Engineering Corporation and Tsinghua Holding Corporation. It says the State Council approved the implementation plan and the budget for the HTR-PM project in February 2008. It also says the Chinese government will support the demonstration so the owner can maintain operation and recover the investment, and it states no amount paid. IAEA ARIS status report: HTR-PM (China)
- Fuel
- Fuel supplier named for this projectCNNC North Nuclear Fuel Element Co., Ltd. · sourceBuilds and operates the fuel-element production line to supply about 300,000 spherical elements a year to the plant (2014).
Source-backed project statement
On 16 September 2014 Tsinghua University reported that equipment installation was basically complete on the demonstration fuel-element line, that CNNC North Nuclear Fuel Element Company undertakes its construction and operation, and that the line would supply about 300,000 spherical elements a year to the Shidaowan demonstration after completion. The report says the university would provide technical services for the first core, which is not a delivery record. The 20 August 2021 operating license says first fuel loading is the start of operation and does not name a supplier. Tsinghua University News: HTR-PM fuel-element production line; NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119)
Not found in the sources we checked (2): Customer or offtaker; Comparable schedule revision
- Customer or offtaker
The 20 August 2021 operating license names Huaneng Shandong Shidao Bay Nuclear Power Company as holder and operating organization of the high-temperature demonstration and names no electricity or heat buyer. The IAEA HTR-PM status report published on 11 October 2024 says this demonstration plant is currently designed for power generation. The IAEA PRIS row for Shidao Bay-1 names that company as operator and China Huaneng Group as owner, which is not an offtake. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); IAEA ARIS status report: HTR-PM (China); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026
- Comparable schedule revision
Comparable schedule revision not established. The IAEA HTR-PM status report published on 11 October 2024 says construction of the plant is scheduled to be completed by the end of 2013. The report does not pair that sentence with a second dated forecast of construction completion. IAEA PRIS records commercial operation of Shidao Bay-1 on 6 December 2023 as an achieved date, and that commercial-operation date is a different milestone. IAEA ARIS status report: HTR-PM (China); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026
Not recorded in SMRMap's reviewed evidence (3): Reactor supplier; Site host or owner; Programs and agreements naming the project
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Commercial operation
HTR-PM commercial operation - · Grid connection
HTR-PM grid connection - · First criticality
HTR-PM first criticality (IAEA PRIS unit date) - · Operating authority recorded
Operating authority recorded: NNSA operating license for the Shidaowan HTR-PM demonstration - · Construction start
HTR-PM construction start (IAEA PRIS)
Dates on the project record: Commercial operation: 6 Dec 2023.
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
Operating-license applications and decisions
- NNSA operating license for the Shidaowan HTR-PM demonstration
Operating authority · Issued / approved · NNSA · decided 20 Aug 2021 · permit 国核安证字第2119号
NNSA issued operating license 国核安证字第2119号 on 20 August 2021 for the high-temperature gas-cooled demonstration (CN-44) at Ningjin Town, Rongcheng, Shandong. The holder and operating organization is Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd. Validity runs through 19 August 2061. First fuel loading is the start of operation. Condition 23 sets control points at 15 percent and 65 percent of plant rated electrical power and states no megawatt number. The legal representative named on the license is not stored.
Sources: NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(5 notes)
- Evidence review. The HTR-PM demonstration at Shidaowan (Shidao Bay), Rongcheng, Shandong, is a twin-module pebble-bed high-temperature gas-cooled plant whose two reactor modules, each with one steam generator, drive a single 210 MWe steam turbine (World Nuclear Association). Live IAEA PRIS (captured 9 October 2026) lists it as one operational unit, Shidao Bay-1, of 500 MWth, 211 MWe gross, 150 MWe net and 200 MWe design net, operated by Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd. and owned by China Huaneng Group, with Tsinghua University as reactor supplier. Preparatory work is kept apart from nuclear construction: WNA says site work was completed and construction began in mid-2011, NNSA approval for full construction came in early December 2012 (PRIS construction-license date 4 December 2012) and first concrete followed a week later (PRIS construction date 9 December 2012); the construction license itself was not opened. NNSA operating license 国核安证字第2119号, issued on 20 August 2021 after NNSA reviewed the company's application and valid until 19 August 2061, covers the whole demonstration project (CN-44) at Ningjin Town, Rongcheng, names the company as holder and operating organization, and states that first fuel loading is the start of operation; it set commissioning control points when the first NSSS module and then the plant pass 15 percent and 65 percent of rated electrical power. Commissioning steps are distinct: fuel loading began in August 2021, the first reactor reached criticality in September 2021 (PRIS 12 September 2021) and the second in November 2021, the unit was connected to the grid on 14 December 2021, and commercial operation began on 6 December 2023. The latest evidenced operating mode is operation under license 2119: PRIS lists it as operational and NNSA's database lists it among operating units (page updated 29 March 2023), and WNA says a district-heating supply was commissioned in March 2024; no opened source gives current load. License conditions require a steam-generator tube in-service-inspection report to NNSA by the end of December 2026 and a periodic safety review about every ten years from first fuel loading. Stored values (two modules, 500 MWth plant scope, Huaneng Shandong as operator, commercial operation 6 December 2023) match the sources; the stored 210 MWe gross matches WNA's turbine rating but differs from PRIS's 211 MWe gross, PRIS's latest operating-license date of 15 March 2021 differs from the opened 20 August 2021 license. At that review the record had no participant roles; roles recorded since are listed on this page. Last checked 19 Oct 2026. IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026; NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration; China HTR-PM commercial operation reporting
What would change this
An NNSA notice on the license-condition reports due by December 2026, a license amendment, or a periodic safety review or status change for Shidao Bay-1. Next scheduled check: 7 Jan 2027.
- Next decision and prerequisites. The 20 August 2021 operating license requires submission to the National Nuclear Safety Administration, by the end of December 2026, of a steam-generator tube in-service inspection report and a reactor-pressure-vessel discharge-pipe weld study report. The regulator database page updated on 29 March 2023 records the operating license and does not record those submissions. No grant or refusal of a further license is stated in the license reviewed. Last checked 23 Oct 2026. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration
What would change this
A published filing or NNSA response to the December 2026 inspection reports required by the operating license. Next scheduled check: 7 Jan 2027.
- Permissions and public process. On 20 August 2021 the National Nuclear Safety Administration issued operating license No. 2119 to Huaneng Shandong Shidao Bay Nuclear Power Company for the high-temperature gas-cooled demonstration project CN-44 at Ningjin Town, Rongcheng, Shandong, valid through 19 August 2061. The regulator database page updated on 29 March 2023 repeats the 20 August 2021 issue date and a 40-year term. IAEA PRIS lists 15 March 2021 as the latest operating-license date for Shidao Bay-1, which is not the date printed on the license reviewed. Last checked 23 Oct 2026. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration; IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026
What would change this
An NNSA instrument amending operating license 国核安证字第 2119 号, or a primary record of the 15 March 2021 PRIS date. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). The 20 August 2021 operating license gives the project address as Ningjin Town, Rongcheng, Shandong. IAEA PRIS records grid connection of Shidao Bay-1 on 14 December 2021, and the IAEA status report milestone list records grid connection on 20 December 2021. These sources do not state a land title, a grid-connection agreement, or a water right. Last checked 23 Oct 2026. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119); IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026; IAEA ARIS status report: HTR-PM (China)
What would change this
A land title, grid-connection agreement, or water right for the Ningjin Town site. Next scheduled check: 21 Jan 2027.
- Spent fuel, waste and closure. The 20 August 2021 operating license lists a solid radioactive-waste storage building as an auxiliary facility and requires a radioactive-waste management program and effluent-monitoring procedures. It also requires early arrangements, including financial arrangements, for decommissioning and radioactive-waste disposal. It does not name a spent-fuel destination, a disposal operator, or a completed closure plan. Last checked 23 Oct 2026. NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119)
What would change this
An operator or NNSA document naming a spent-fuel destination or a waste-disposal contract for this plant. Next scheduled check: 21 Jan 2027.
Evidence dates
(3 of 9 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(9)
- China HTR-PM commercial operation reporting (directory or tracker, accessed 1 Oct 2026)
- IAEA Power Reactor Information System (PRIS) (IAEA/NEA, accessed 1 Oct 2026)
- Global Energy Monitor Global Nuclear Power Tracker (directory or tracker, accessed 2 Oct 2026)
- IAEA ARIS status report: HTR-PM (China) (IAEA/NEA, accessed 9 Oct 2026)
- IAEA PRIS statistics: reactors by country code (China), captured 9 October 2026 (IAEA/NEA, accessed 17 Oct 2026)
- NNSA operating licence for the Shidaowan high-temperature gas-cooled demonstration (Guohe Anzheng Zi No. 2119) (regulator, dated 20 Aug 2021, accessed 15 Oct 2026)
- NNSA operating-unit database: Shidaowan high-temperature gas-cooled demonstration (regulator, page updated 29 Mar 2023, accessed 15 Oct 2026)
- WNN: First vessel installed in China's HTR-PM unit (news report, published 21 Mar 2016, accessed 21 Oct 2026)
- Tsinghua University News: HTR-PM fuel-element production line (academic, published 16 Sep 2014, accessed 21 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: HTR-PM Shidaowan demonstration — https://smrmap.com/projects/htr-pm-shidaowan/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “HTR-PM Shidaowan demonstration”. Record reviewed 19 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/htr-pm-shidaowan/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.