Huaneng Xiapu Nuclear Power Co.
The June 2017 China Energy News report republished by CAEA names this project company as investing in and building one planned HTGR and four planned PWR units in Xiapu. This historical development role does not establish current ownership or an operating license. It is distinct from the CNNC Xiapu fast-reactor project company.
- Projects
- Announced: Huaneng Xiapu 600 MW HTGR unit (site plan).
- Evidence
- One source (news report). Record reviewed 20 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Project proposer
- Category
- other
- Country
- China
- Confidence
- medium
- Record reviewed
- 20 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project record: 1 announced, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Huaneng Xiapu 600 MW HTGR unit (site plan) — Announced · China
Recorded link: project proposer · project record checked 2 Oct 2026 · timeline · permission status · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(1)
- CAEA: Huaneng Xiapu nuclear project (news report, accessed 2 Oct 2026)