Projects / China · Announced

Huaneng Xiapu 600 MW HTGR unit (site plan)

The Xiapu site plan, in the national plan since 2015 and still listed by Ningde city in 2023, includes one 600 MW high-temperature gas-cooled unit beside four large PWRs.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

No approval, license or schedule for the HTGR is established; the 2025 Xiapu approval covers Hualong One units, which are outside scope.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Xiapu nuclear site (Changbiao Island) · China · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the Xiapu plant's high-temperature reactor entry (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); plant-area point at the Xiapu site on Changbiao Island, not a surveyed unit position.
Coordinates
26.801942, 120.151957 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Huaneng Xiapu 600 MW HTGR unit (site plan) is recorded at Xiapu nuclear site (Changbiao Island), Fujian, China. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'xiapu-nuclear-power-plant-htr' (26.801942, 120.151957)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Funding and government decisions

Source-backed project statement China Energy News reported in June 2017, in a report republished by the China Atomic Energy Authority, that Huaneng Xiapu Nuclear Power would invest in and build the planned 600 MW high-temperature unit, and listed the joint venture's shareholders: Funeng 10 percent, Huaneng Nuclear Development 30 percent, Huaneng International Power Development 22.5 percent, Huaneng Power International 22.5 percent, CNNC's China National Nuclear Power 10 percent and Ningde state assets 5 percent. This is a planned owner investment with no amount, and no approval for the unit is reported. CAEA: Huaneng Xiapu nuclear project

Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
Customer or offtaker

Ningde's 7 June 2023 notice and China Energy News' 2017 report, republished by the China Atomic Energy Authority, name Huaneng Xiapu Nuclear Power as the company for the planned 600 MW high-temperature unit. Neither names a buyer of the unit's power or heat. Ningde notice on the Xiapu nuclear site

Contractor

China Energy News reported in June 2017 that Huaneng Xiapu Nuclear Power, the project company, would invest in, build and operate the 600 MW high-temperature unit, and that Tsinghua University, as the technology developer, published a 600 MW scheme in December 2016. These are the owner and design developer, not a contractor appointment. Neither that report nor Ningde's 7 June 2023 notice names an engineering or construction contractor for the unit. CAEA: Huaneng Xiapu nuclear project

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

Ningde's 7 June 2023 notice and China Energy News' 2017 report describe the planned 600 MW high-temperature unit and Tsinghua's design scheme but name no fuel manufacturer, quantity or delivery for it. A closed-fuel-cycle sentence in the 2017 report concerns the separate fast-reactor demonstration. CAEA: Huaneng Xiapu nuclear project

Comparable schedule revision

Comparable schedule revision not established. Ningde's 7 June 2023 notice says the National Energy Administration included the Xiapu site in the national plan in May 2015 for one 600 MW high-temperature unit and four large pressurised-water units, and gives later dates only for pressurised-water preparatory steps. China Energy News' 2017 report gives targets for the separate fast reactor. No construction or operation date for the high-temperature unit is stated, so there is nothing to revise. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(8 notes, 1 not yet reviewed)
  • Evidence review. Ningde's 7 June 2023 notice places the Xiapu site at Changbiao Island and says the plan is four million-kilowatt-class pressurized-water units and one 600,000-kilowatt high-temperature gas-cooled unit. It says a May 2015 National Energy Administration letter included the site in the national plan for technical demonstration, public communication and site protection on that scale. The same notice's current permits and the two Hualong One units are the pressurized-water phase. A 15 June 2017 report says Huaneng Xiapu Nuclear Power would build the gas-cooled unit and four pressurized-water units, and that a different company would build a 600,000-kilowatt fast-reactor demonstration. Tsinghua's 2016 scheme of six modules and an electrical output that can reach 655,000 kilowatts is a design description, not a stored project rating. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. The June 2017 China Energy News report, republished by CAEA, names Huaneng Xiapu Nuclear Power Co. as the project company investing in and building the planned HTGR and PWR units. This dated developer role does not establish a current operating license. China Huaneng Group and the separate CNNC Xiapu fast-reactor company are not substituted. Last checked 20 Oct 2026. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project
    What would change this

    An approval that selects the high-temperature gas-cooled unit's configuration and a construction date. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The site plan says one 600,000-kilowatt high-temperature gas-cooled unit. The six-module scheme, with electrical output that can reach 655,000 kilowatts, is a 2016 technology description. The empty design field stays empty. Last checked 20 Oct 2026. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project
    What would change this

    A project approval that selects one gas-cooled configuration. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed. Both pages name Changbiao Island in Xiapu County. The 2023 notice gives the town and village. No coordinates are stated; the map uses the NuclearChain plant-area point for the Xiapu site. Last checked 20 Oct 2026. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project
    What would change this

    A surveyed coordinate for the gas-cooled unit's plot on the island. Next scheduled check: 20 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. CAEA: Huaneng Xiapu nuclear project
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Developer or proposer. The June 2017 China Energy News report, republished by CAEA, names Huaneng Xiapu Nuclear Power Co. as the project company investing in and building the planned HTGR and PWR units. This dated developer role does not establish a current operating license. China Huaneng Group and the separate CNNC Xiapu fast-reactor company are not substituted. Last checked 20 Oct 2026. CAEA: Huaneng Xiapu nuclear project
    What would change this

    A later project-company or official notice defining changed development responsibilities or naming the intended operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. The June 2023 Ningde notice says phase one at Xiapu consists of two Hualong One units, so the 600 MW HTGR is not part of the current phase. No decision, schedule or approval step for the HTGR unit is given in the sources reviewed. Last checked 23 Oct 2026. Ningde notice on the Xiapu nuclear site
    What would change this

    A Huaneng or NEA announcement placing the Xiapu HTGR into a construction phase. Next scheduled check: 23 Oct 2027.

  • Permissions and public process. Ningde city's June 2023 notice says the NEA's May 2015 letter put the Xiapu site in the national nuclear plan for one 600 MW HTGR and four large PWRs, for technical justification, public communication and site protection. The environmental review and public consultation it describes from 2022-2023 cover the PWR units, not the HTGR. No approval, license or environmental filing for the HTGR unit is shown in the sources reviewed. Last checked 23 Oct 2026. Ningde notice on the Xiapu nuclear site
    What would change this

    An NEA, MEE or NNSA document opening a separate approval or environmental review for the Xiapu HTGR unit. Next scheduled check: 23 Oct 2027.

  • Site dependencies (land, grid, water). The June 2023 Ningde notice places the Huaneng Xiapu site on Changbiao Island, Changmen village, Changchun town, Xiapu county, planned for four PWRs and one 600 MW HTGR, with phase one limited to two Hualong One units. A 2017 China Energy News item describes it as a coastal site on the south-west shore of Funing Bay. No land, grid or cooling arrangement specific to the HTGR unit is described. Last checked 23 Oct 2026. Ningde notice on the Xiapu nuclear site; CAEA: Huaneng Xiapu nuclear project
    What would change this

    A Huaneng document scheduling the HTGR unit or describing its connection and cooling arrangements. Next scheduled check: 23 Oct 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Huaneng Xiapu 600 MW HTGR unit (site plan) — https://smrmap.com/projects/xiapu-htgr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Huaneng Xiapu 600 MW HTGR unit (site plan)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/xiapu-htgr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.