Companies / org-indiana-michigan-power
Indiana Michigan Power (I&M)
American Electric Power operating company that named property at its Rockport Plant in Spencer County, Indiana, as a potential SMR site in January 2025 and applied, under TVA's DOE grant application, for early-site-permit funding using the BWRX-300. No future reactor operator, permit or construction is established.
- Roles
- Utility, Project proposer
- Organization type
- utility
- Country
- United States
- Aliases
- I&M
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
AEP names I&M as an operating company. AEP's public share listing is not assigned to this subsidiary; separate ownership and listing details were not opened. - Confidence
- medium
- Last verified
- 2026-10-10
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 announced. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- AEP Rockport BWRX-300 proposal — Announced · United States
Recorded link: project proposer · project record checked 2026-10-10 · permission status · sources
Ownership & relationships
- American Electric Power — parent of Indiana Michigan Power (operating company) · as of 2025-01-17. AEP's release identifies I&M as its operating company for the Rockport proposal.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- AEP potential new SMR sites (company_primary, accessed 2026-10-10)