Projects / United States · Announced

AEP Rockport BWRX-300 proposal

Indiana Michigan Power (I&M), an AEP operating company, named property at its Rockport Plant in Spencer County, Indiana, as a potential SMR site in January 2025.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 1 of 4 listed sources has a publication or document date recorded here: 23 Jul 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 17 Jan 2025 · Announcement: AEP Rockport BWRX-300 proposal documented. Indiana site named for a potential BWRX-300 deployment in an application for federal support. Source: AEP potential new SMR sites. Updates entry
More on this development

Funding and development remain conditional; no construction start is established.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
Same design
18 tracked: 1 construction, 4 licensing, 10 siting, 3 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Schematic of BWRX-300. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300.

Description

As a subrecipient under TVA's application to DOE's Generation III+ SMR program, with GE Hitachi as technology provider, I&M sought $50 million for early-site-permit work and a preliminary safety analysis using the BWRX-300. A grant application is not a permit; no NRC application, future operator or construction start is established, and AEP put commercial use of an SMR at least a decade away.

Key facts

Design
BWRX-300 (SMR)
Technology
Boiling water reactor (BWR) · light water
Reactor vessel of this design
27 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 25.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
GE Vernova Hitachi Nuclear Energy
Location
Rockport Plant, Spencer County (I&M SMR site) · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate coordinates for the named Rockport plant from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker); AEP Rockport BWRX-300 proposal.
Coordinates
37.9273, -87.0384 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
10 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

AEP Rockport BWRX-300 proposal is recorded at Rockport Plant, Spencer County (I&M SMR site), Indiana, United States. Operator: No operator is recorded. Recorded vendor: GE Vernova Hitachi Nuclear Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'rockport-nuclear-power-plant' (37.9272923, -87.0384356)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 870 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Contractor

Source-backed project statement AEP’s 17 January 2025 release cited a November 2024 Indiana Office of Energy Development siting report performed by Purdue University that identified Rockport as suitable. This is an attributed state study, not an I&M construction contract or site permission. AEP potential new SMR sites

Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The release speaks of bringing nuclear power to AEP's customers and of I&M's existing customers. That is the utility's general service, not a named buyer, quantity, or agreement for a Rockport SMR. No offtake is disclosed. AEP potential new SMR sites

Funding and government decisions

AEP's 17 January 2025 release says Indiana Michigan Power, as a subrecipient in a funding partnership with TVA and GE Hitachi, was seeking US$50 million from DOE to begin early-site-permit and preliminary safety analysis work at Rockport, and would carry out that work if awarded. That is a grant application. No award, amount granted or disbursement is shown in the source read. AEP potential new SMR sites

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

The release names the GE Hitachi BWRX-300 as the technology for the grant-supported work. It does not name a fuel supplier, a fuel form, or a delivery. The phrase fuel cells in the same release refers to other AEP resources, not nuclear fuel for this proposal. AEP potential new SMR sites

Comparable schedule revision

Comparable schedule revision not established. The 17 January 2025 release gives one company estimate: commercial use of an SMR is at least a decade away. It is not tied to a named Rockport unit, and there is no earlier date in the opened release for the same milestone. A single estimate is not a site revision. AEP potential new SMR sites

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Assessments of the design (not of this site)

(2)
  • BWRX-300 UK Generic Design Assessment (two steps) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · ONR/EA (UK) · completed Dec 2025
    The UK regulators began a two-step Generic Design Assessment of the GE Vernova Hitachi BWRX-300 on 25 January 2024 at the government's request. Step 1 ran from January to December 2024 and Step 2 from December 2024 to December 2025, when ONR issued its Step 2 GDA statement and the Environment Agency and Natural Resources Wales their Step 2 summary of findings. ONR's page records no Step 3 and no Design Acceptance Confirmation. The assessment is not permission for any site, construction or operation.
    Sources: ONR, GE Vernova Hitachi BWRX-300 Generic Design Assessment; Environment Agency: assessing new nuclear reactor designs
  • CNSC vendor design review, Phases 1 and 2 (BWRX-300) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Mar 2023
    CNSC lists a combined Phase 1 and 2 pre-licensing vendor design review of GE Hitachi's BWRX-300 among its completed reviews, with an executive summary dated March 2023. CNSC entered into the agreement with GE Hitachi to conduct the review on 11 December 2019; that is an agreement date, not an application or a decision. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. The Darlington license to construct is a separate, site-specific permission.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: GE Hitachi BWRX-300 vendor design review executive summary

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. AEP's news release of 17 January 2025 says that through Indiana Michigan Power it has identified property at the Rockport Plant in Spencer County, Indiana, as a potential SMR site, and that I&M is seeking $50 million, as a subrecipient with TVA and GE Hitachi, for early site permit work and a preliminary safety analysis using the BWRX-300. A grant request is not a permit, and the release does not say an NRC application has been filed or that construction has started. No fuel supplier, offtaker or licensed operator is named. The stored BWRX-300 design, I&M as proposer, AEP as parent, GE Hitachi as vendor, approximate site and announced stage stay. The Global Energy Monitor page does not discuss this project in the passages read. Last checked 19 Oct 2026. AEP potential new SMR sites
    What would change this

    A DOE award decision, or an NRC early site permit application for Rockport, would change this record. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. AEP's January 2025 release says that, if awarded DOE funds, I&M would carry out early site permit activities and a preliminary safety analysis report at Rockport using the BWRX-300. The July 2026 Indiana Capital Chronicle report says I&M was still seeking federal grants, so the funding decision is the gating step shown. The sources read do not report a grant award or an NRC filing date. Last checked 23 Oct 2026. AEP potential new SMR sites; Indiana officials aim to inspire nuclear development — starting with local-level support
    What would change this

    A DOE grant decision for I&M's Rockport work, or an early site permit application. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. AEP's January 2025 release says Indiana Michigan Power sought DOE grant funding, as a subrecipient under TVA's application, to start early site permit work at Rockport, including gathering public input, and would hold a public open house; it says Spencer County officials had approved an ordinance supporting new generation at the site, including SMRs. The Indiana Capital Chronicle reported in July 2026 that I&M was still seeking federal grants to support the approval process. No NRC application or permit is recorded. Last checked 23 Oct 2026. AEP potential new SMR sites; Indiana officials aim to inspire nuclear development — starting with local-level support
    What would change this

    An early site permit application to the NRC for Rockport, or a DOE grant award to I&M. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). AEP's January 2025 release identifies property at I&M's company-owned Rockport Plant in Spencer County, Indiana, as a potential SMR site. The Indiana Capital Chronicle reported in July 2026 that I&M was also seeking state approval for a 1,520-megawatt gas plant at the Rockport site while evaluating it for nuclear. No specific SMR plot, grid connection or cooling-water arrangement is described in these sources. Last checked 23 Oct 2026. AEP potential new SMR sites; Indiana officials aim to inspire nuclear development — starting with local-level support
    What would change this

    An early site permit application or site study describing the SMR location and its grid and water arrangements at Rockport. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 4 sources with a publication or document date)
Latest dated listed source publication: Indiana officials aim to inspire nuclear development — starting with local-level support: 23 Jul 2026.Latest dated recorded event: AEP Rockport BWRX-300 proposal documented: 17 Jan 2025.3 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: AEP Rockport BWRX-300 proposal — https://smrmap.com/projects/aep-rockport/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “AEP Rockport BWRX-300 proposal”. Record reviewed 10 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/aep-rockport/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.