Companies / org-palisades-energy

Palisades Energy, LLC

The Pioneer application says this existing Holtec subsidiary is expected to serve as licensed operator of Pioneer Units 1 and 2 after completion. No operating licence for those units is implied.

Roles
Operator
Organization type
operator
Country
United States
Aliases
—
Listing status
Unknown
Exchange / ticker
—
Ownership / control
unknown
Website
—
Confidence
medium
Last verified
2026-10-09

Linked designs

Tracked deployment projects

1 linked project records: 1 licensing. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources