Companies / org-palisades-smr
Palisades SMR, LLC
The Pioneer application identifies this Holtec subsidiary as the intended licensed owner of the proposed units and the entity on whose behalf SMR, LLC filed. No construction or operating licence is implied.
- Roles
- Other
- Organization type
- other
- Country
- United States
- Aliases
- —
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
- Website
- —
- Confidence
- medium
- Last verified
- 2026-10-09
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 licensing. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades) — Licensing · United States
Recorded link: intended licensed owner · project record checked 2026-10-09 · 3 recorded project actions · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- Pioneer Units 1 and 2 application, General and Financial Information (ML25365A986) (regulator_primary, accessed 2026-10-09)