PT Thorcon Power Indonesia
Applicant for the Thorcon 500 / TMSR500 molten-salt plant proposal on Kelasa Island. BAPETEN has approved site evaluation, not construction.
- Projects
- Siting: Thorcon 500, Kelasa Island. 1 design.
- Evidence
- 2 sources; first primary source: BAPETEN site-evaluation approval, Thorcon 500, Kelasa. Record reviewed 1 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Reactor developer, Vendor
- Category
- vendor
- Country
- Indonesia
- Aliases
- Thorcon, ThorCon, PT TPI
- Ownership / control
- Unknown
BAPETEN names PT Thorcon Power Indonesia as applicant. Parent-company control was not verified from a filing. - Confidence
- medium
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current activity)
All fields
(3 without a known value)
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Website
- None recorded in this release
Linked designs
- Thorcon 500 (TMSR500) — Molten salt reactor (MSR) · SMR
Tracked deployment projects
1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Thorcon 500, Kelasa Island — Siting · Indonesia
Recorded link: vendor/developer field, operator/host field, project proposer · project record checked 6 Oct 2026 · timeline · 1 recorded project action · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- BAPETEN site-evaluation approval, Thorcon 500, Kelasa (regulator, accessed 1 Oct 2026)
- BAPETEN receipt of Thorcon TMSR500 site-evaluation application (regulator, accessed 1 Oct 2026)