Designs

Thorcon 500 (TMSR500)

BAPETEN describes a 500 MWe molten-salt plant. WNN, citing Thorcon, describes two 250 MWe reactors in sealed cans. Gross versus net is not stated. Site-evaluation approval is not a construction license. Plant total is 500 MWe, above the per-module guide; inclusion uses the stated 250 MWe module.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
Siting: Thorcon 500, Kelasa Island. Development status as stated: Preliminary design.
Evidence
4 sources; first primary source: BAPETEN receipt of Thorcon TMSR500 site-evaluation application. Record reviewed 1 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s)
PT Thorcon Power Indonesia
Module electrical
250 MWe (gross/net unspecified)
Fuel form
UF4 / molten salt
Development status (as stated)
Preliminary design
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. The June 2025 IAEA catalog section contributed by Thorcon International calls Thorcon a thermal molten salt reactor, with molten salt coolant and graphite moderator, and lists thermal/electrical capacity as 557 / 250 (per module). Design status in that section is preliminary design. The same section says each 250 MWe power module contains two replaceable reactors in sealed cans, and another sentence says 557 MWe reactor cans, which does not match the table's placement of 557 in the MWt position. World Nuclear News on 5 August 2025, citing the project, describes a 500 MWe plant of two 250 MWe reactors in sealed cans. BAPETEN's page records evaluation of PT Thorcon Power Indonesia's site-evaluation application for the Thorcon 500 plant at Kelasa Island, filed 21 January 2025. That is a site-evaluation step, not a construction license. Stored 250 MWe per module agrees with the catalog's per-module electrical figure and with WNN. The thermal number is not stored because the catalog section uses 557 both as MWt in the table and as MWe in one sentence. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa
    What would change this

    A Thorcon or BAPETEN design approval that resolves whether 557 is MWt per module and whether 250 MWe is per can or per power module. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Site applications and decisions