Projects / Indonesia · Siting

Thorcon 500, Kelasa Island

BAPETEN decision 00003.556.1.300725 of 30 Jul 2025 approves site evaluation for a Thorcon 500 molten-salt plant on Kelasa Island after a 21 Jan 2025 application.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . None of the 5 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
Recorded: BAPETEN Kelasa site-evaluation approval (30 Jul 2025). All permissions and applications
Latest development
30 Jul 2025 · Site permission recorded: Site permission recorded: BAPETEN Kelasa site-evaluation approval. Decision 00003.556.1.300725 authorizes PT Thorcon Power Indonesia to conduct site evaluation under its PET and SMET. Source: BAPETEN site-evaluation approval, Thorcon 500, Kelasa; BAPETEN safety-evaluation report index, Thorcon 500. Updates entry
More on this development

It is not a construction license.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Description

That approval lets the applicant carry out the site-evaluation program. It is not a construction license or a site license. BAPETEN states 500 MWe for the plant. Two 250 MWe modules are the developer's description, reported by WNN, and are not in the opened BAPETEN decision text. BAPETEN's site news list (read to 2026) shows no later decision; its 9 September 2026 parliamentary briefing says the Bangka Belitung and West Kalimantan proposals are entering licensing stages without naming which proposal is the small modular reactor.

Key facts

Design
Thorcon 500 (TMSR500) (SMR)
Technology
Molten salt reactor (MSR) · molten salt
Operator(s)
PT Thorcon Power Indonesia
Vendor for linked design
PT Thorcon Power Indonesia
Location
Kelasa Island (Pulau Gelasa) · Indonesia · precision: site area (named plant, laboratory, base, port, campus or parcel)
OpenStreetMap Nominatim centroid for Pulau Gelasa, the spelling used on the island feature. BAPETEN uses Pulau Kelasa. Island centroid, not a reactor footprint.
Coordinates
-2.4140419, 107.0741399 · site-area point (approximate)
Electrical capacity
500 MWe (gross/net unspecified) · scope: plant
Thermal capacity
Not recorded
Modules planned
2
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
6 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Thorcon 500, Kelasa Island is recorded at Kelasa Island (Pulau Gelasa), Bangka Belitung Islands, Indonesia. Operator: PT Thorcon Power Indonesia. Recorded vendor: PT Thorcon Power Indonesia. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: centroid of the island feature 'Pulau Gelasa' (Kelasa Island)

Recorded electrical output is 500 MWe (gross/net unspecified), scope plant. Modules planned: 2. Thermal output is not recorded on this project. The linked design record states 250 MWe (gross/net unspecified); the project figure is kept separate.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Fuel
  • Fuel form stated for Thorcon 500 (TMSR500)UF4 / molten salt
No project-specific fuel supply arrangement is recorded as a structured fact.

World Nuclear News' 5 August 2025 report describes the Thorcon 500 as two low-enriched-uranium-fuelled 250 MWe reactors in replaceable sealed Cans. That is a design description, and neither it nor BAPETEN's press release names a fuel supplier, contract or delivery for Kelasa. WNN: regulatory approval for Indonesian Thorcon site survey

Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

BAPETEN's 6 August 2025 press release and World Nuclear News' 5 August 2025 report describe approval of Thorcon's site evaluation program for Kelasa Island and Indonesia's national aim of 10 GW of nuclear capacity by 2040. Neither names a buyer or power purchase agreement for the Kelasa plant. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa

Contractor

BAPETEN's 6 August 2025 press release says it approved the site evaluation program submitted by PT Thorcon Power Indonesia, the developer's subsidiary, on 21 January 2025, and World Nuclear News says the next steps are a site license and design approval. The applicant is the project's developer, and neither source names an engineering or construction contractor. BAPETEN site-evaluation approval, Thorcon 500, Kelasa; WNN: regulatory approval for Indonesian Thorcon site survey

Funding and government decisions

BAPETEN's 6 August 2025 press release and World Nuclear News' 5 August 2025 report state no amount, funder or financing for the Kelasa plant. BAPETEN site-evaluation approval, Thorcon 500, Kelasa; WNN: regulatory approval for Indonesian Thorcon site survey

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News reported on 5 August 2025 that Thorcon saw potential to start construction in 2027 and reach full power by 2031, each stated once. BAPETEN's dates are the January 2025 application and the 30 July 2025 decision, which are licensing steps. No earlier and later dates for the same milestone appear. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa

Not recorded in SMRMap's reviewed evidence (1): Site host or owner
Site host or owner

Timeline

Recorded developments

Permissions and applications

Site applications and decisions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes)
  • Evidence review. The 6 August 2025 BAPETEN press page says decision 00003.556.1.300725 was issued on 30 July 2025 after PT Thorcon Power Indonesia applied on 21 January 2025 for site-evaluation approval of a Thorcon 500 plant on Kelasa Island. This page does not state a megawatt figure or a module count. The stored 500 MWe and 2 modules stay. Stage stays siting. The decision text itself is a link, not the body of this capture. Last checked 20 Oct 2026. BAPETEN site-evaluation approval, Thorcon 500, Kelasa
    What would change this

    The text of decision 00003.556.1.300725, or a construction-license application for Kelasa. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. After the July 2025 site-evaluation approval, Thorcon said its next steps are a BAPETEN site license and design approval, with construction potentially starting in 2027 and full power by 2031. These are company aims reported by trade press, not regulatory schedules, and no site-license application is recorded in the opened sources. Last checked 23 Oct 2026. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa
    What would change this

    A BAPETEN site-license or design-approval application or decision for Kelasa. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. BAPETEN decision 00003.556.1.300725 of 30 July 2025 approved PT Thorcon Power Indonesia's site-evaluation program and its management-system plan after a January 2025 application, which followed about two years of pre-licensing consultation. This lets the company evaluate the site. It is not a site license, design approval or construction license, and the opened sources record no public consultation or local consent decision. Last checked 23 Oct 2026. BAPETEN site-evaluation approval, Thorcon 500, Kelasa; WNN: regulatory approval for Indonesian Thorcon site survey
    What would change this

    A BAPETEN site-license application or decision, or a documented public or local consultation for Kelasa. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. A preliminary survey on Kelasa Island, Central Bangka, was reported as identifying a strong candidate site, with further site evaluation now approved. That is a study, not a secured arrangement. The opened sources name no land agreement, grid connection or cooling-water arrangement for the plant. Last checked 23 Oct 2026. WNN: regulatory approval for Indonesian Thorcon site survey; BAPETEN site-evaluation approval, Thorcon 500, Kelasa
    What would change this

    A site-evaluation result, land, grid or cooling agreement for the Kelasa plant. Next scheduled check: 21 Jan 2027.

  • Spent fuel, waste and closure: Not disclosed in the reviewed evidence. The developer's design description, as reported, replaces each sealed reactor can after about eight years and tows the module to a maintenance center. That is a design operating concept. The opened sources name no spent-fuel storage, waste-management or decommissioning arrangement for Kelasa. Last checked 23 Oct 2026. WNN: regulatory approval for Indonesian Thorcon site survey
    What would change this

    A Thorcon or BAPETEN document describing spent-fuel or waste arrangements for the Kelasa plant. Next scheduled check: 21 Jan 2027.

Evidence dates

(0 of 5 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: BAPETEN approves Kelasa site evaluation: 30 Jul 2025.5 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Thorcon 500, Kelasa Island — https://smrmap.com/projects/thorcon-kelasa/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Thorcon 500, Kelasa Island”. Record reviewed 6 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/thorcon-kelasa/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.