Shandong Nuclear Power Co.
Operator of the Haiyang nuclear plant, named in the regulator's September 2024 siting review opinion as builder and operator by commission of the Haiyang integrated small reactor demonstration project.
- Evidence
- 3 sources; first primary source: NNSA: site-selection review opinion No. 2414 for the Shandong Haiyang integrated small reactor demonstration project (10 September 2024). Record reviewed 6 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Operator
- Category
- operator
- Country
- China
- Listing status
- State-controlled (not independently listed) · source 关于国电投核能有限公司资产交割过渡期合并利润表的专项审核报告 · listing checked 6 Nov 2026
- Ownership / control
- State-controlled
Lianhe Credit's 4 Sept 2026 rating report states that at end-March 2026 国电投核能有限公司 held 65.00% as controlling shareholder, SPIC was the actual controller and SASAC the ultimate controller. - Record reviewed
- 6 Oct 2026 (record review date, not proof of current activity)
All fields
(3 without a known value)
- Aliases
- None recorded in this release
- Exchange / ticker
- None recorded in this release
- Website
- None recorded in this release
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Shandong Haiyang integrated small reactor demonstration project (heat only) — Siting · China
Recorded role: operator or host · record checked 6 Oct 2026 · timeline · 1 recorded project action · sources
Ownership & relationships
- 国电投核能有限公司 (SPIC Nuclear Energy Co.): Subsidiary of · as of 6 Nov 2026. Recorded in the 2026-11-06 listing check.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Not yet established about this organization
- None noted for this organization; linked projects may still have open evidence.
Sources
(3)
- NNSA: site-selection review opinion No. 2414 for the Shandong Haiyang integrated small reactor demonstration project (10 September 2024) (regulator, accessed 6 Oct 2026)
- 关于国电投核能有限公司资产交割过渡期合并利润表的专项审核报告 (company, published 20 Apr 2026, accessed 6 Nov 2026)
- 山东核电有限公司主体长期信用评级报告 (news report, published 4 Sep 2026, accessed 6 Nov 2026)
Cite or share this page
SMRMap. “Shandong Nuclear Power Co.”. Record reviewed 6 Oct 2026. https://smrmap.com/companies/shandong-nuclear-power-co/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.