Companies / org-skhk

Siberian Chemical Plant JSC (Siberian Chemical Combine)

IAEA PRIS lists Siberian Chemical Plant JSC as operator and owner of BREST-OD-300 at Seversk. A TVEL/Siberian Chemical Combine release reports the reactor-vessel concreting milestone. Its corporate parent is not established here.

Roles
Operator
Organization type
operator
Country
Russia
Aliases
—
Listing status
Unknown
Exchange / ticker
—
Ownership / control
unknown
Website
—
Confidence
medium
Last verified
2026-10-10

Linked designs

Tracked deployment projects

1 linked project records: 1 construction. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources