Russia SMR projects

11 tracked projects and proposals in this directory. Named proposals, demonstrations and achieved deployments retain their recorded stages.

Announced: 5 · Siting: 1 · Licensing: 1 · Construction: 2 · Operating: 1 · Canceled: 1

Open these projects in Projects (on the map) · Coverage and stage definitions

Counts describe the selected dataset, not a complete national or worldwide census. Sources and check dates are linked from each record.

Country brief

Recorded answers for these 11 projects — customer or offtaker: 3 of 11; contractor: 4 of 11; funding and government decisions: 4 of 11; fuel supplier named for this project: 1 of 11; programs and agreements naming the project: 6 of 11. Who is involved, project by project.

Latest recorded developments

Newest first: steps of these projects, the latest step of each of this country's policy measures, and agreements or programs that concern it.

Next documented targets

Targets are plans, not achievements or commitments.

Projects

Showing 11 of 11 projects

Project and categoryStageDesignCapacityRecorded organizationsLocationRecord reviewed
Akademik Lomonosov floating NPPSMROperatingKLT-40S70 MWe (gross) · plant · 300 MWth (nameplate; basis unspecified)Pevek floating NPP berthChukotka · site-area point (approximate)18 Oct 2026Latest source 19 Aug 2026Latest event 22 May 2020
Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)SMRConstructionRITM-200S—Cape Nagloynyn (Baim / PEB-106 floating mooring)Chukotka · site-area point (approximate)18 Oct 2026Latest source 13 Aug 2026Latest event 24 Sep 2026
BREST-OD-300 SeverskSMRConstructionBREST-OD-300300 MWe (gross) · module · 700 MWth (nameplate; basis unspecified)Seversk BREST-OD-300 siteTomsk Oblast · site-area point (approximate)18 Oct 2026Latest source 19 Jun 2026Latest event 7 Oct 2026
Dimitrovgrad SVBR-100 pilot proposal (2013 land lease)SMREarlier-plan recordCanceledSVBR-100100 MWe (gross/net unspecified) · plantDimitrovgradUlyanovsk · site-area point (approximate)2 Oct 2026Latest source 2024Latest event: none dated
First ELENA-AM thermoelectric heating pilot proposalSMRAnnouncedELENA-AM—Undisclosed13 Oct 2026Latest source Sep 2023Latest event: none dated
Floating nuclear power unit for Gazprom's Kirinskoye fields, SakhalinSMRAnnouncedRITM-200S116 MWe (gross/net unspecified) · plantKirinskoye and Yuzhno-Kirinskoye gas-condensate fieldsSakhalin Oblast · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Kaliningrad floating small nuclear plants proposalSMRAnnouncedDesign profile not linked—Kaliningrad Oblastregion only, no map pin13 Oct 2026Latest source 1 Oct 2026Latest event: none dated
Norilsk land small nuclear plant (RITM-400)SMRAnnouncedRITM-400320 MWe (gross/net unspecified) · plantNorilsk (small nuclear plant location to be selected)Krasnoyarsk Krai · town named, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)SMRAnnouncedRUTA-7070 MWth (thermal only; nameplate; basis unspecified)Not recordedInstitute of Physics and Power Engineering (IPPE), ObninskKaluga Oblast · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Shelf-M small nuclear plant at the Sovinoe deposit, ChukotkaSMRSitingSHELF-M10 MWe (gross/net unspecified) · plant · 35 MWth (nameplate; basis unspecified)Sovinoe gold depositChukotka · named site, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
Yakutia land-based RITM-200N (Ust-Kuyga)SMRLicensingRITM-200N55 MWe (gross/net unspecified) · moduleUst-Kuyga (Yakutia land-based RITM-200N)Sakha (Yakutia) · site-area point (approximate)18 Oct 2026Latest source 3 Mar 2026Latest event 27 Feb 2026

Research coverage for the 11 matching projects: of 99 answers to nine review questions, 40 have a supported statement, 52 were reviewed with a stated limit and 7 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker56000011
Contractor56000011
Funding110000011
Project fuel commitment29000011
Comparable schedule revision28010011
Permissions and public process64000111
Site dependencies (land, grid, water)83000011
Spent fuel, waste and closure41000611
Next decision and prerequisites73100011
All nine questions4050110799

Agreements (6)

Agreements, plans, studies and government programs that concern this country. They are not deployment projects and are not counted as projects or reactors.

Recorded project permissions and applications

These documents concern the linked projects only. A country-wide approval is not inferred; design assessments, site permissions, construction permissions and operating authority remain separate.

  • None recorded in this release.

Designs developed here (26)

Designs whose developer organization is based in this country. A design developed here is not a deployment here.

The first 12 of 26, alphabetically. All 26 designs in the directory.

Organizations here (19)

The first 12 of 19, alphabetically. All 19 organizations in the directory.

Cite or share this page

SMRMap. “Russia SMR projects”. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/countries/ru/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.