Projects / Russia · Construction

BREST-OD-300 Seversk

Lead-cooled fast demonstration reactor at Seversk.

Current status

Stage
Construction
How current
General record check . Bounded evidence review . 4 of 12 listed sources have a publication or document date recorded here; the newest is 19 Jun 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Reported 7 Oct 2026 · Recorded development: BREST-OD-300 turbine hall receives separator-superheaters. Rosatom said two separator-superheaters were installed in the turbine hall; concreting of the turbine foundation began in May 2026. Source: World Nuclear News: Key equipment installed in BREST-OD-300 turbine hall (7 October 2026). Updates entry
More on this development

This is non-nuclear turbine-hall work; it does not change the operation schedule.

Next dated milestone
Planned commercial operation: 2028 (target). Planned step: 2027 (target). Concreting of the BREST-OD-300 reactor vessel to finish (company target). These are not commitments or achieved milestones. Source: Atomic Energy 2.0 (relaying TVEL/SKhK release): First stage of BREST-OD-300 reactor-vessel concreting completed (14 September 2026).
Selected limitations
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Permission evidence appropriate to stage (reviewed: source unavailable; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Schematic of BREST-OD-300. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300.

Description

IAEA PRIS dates its construction license to 10 February 2021 and construction start to 8 June 2021. Live PRIS lists 700 MWth, 300 MWe gross and 281 MWe net, while the IAEA’s printed 2026 reactor tables list 306 MWe gross and 300 MWe net; the 300 MWe recorded here follows live PRIS as gross, and the conflict is preserved. PRIS gives 31 December 2028 as the expected commercial-operation date; that is a planned date, not an achievement. A TVEL release of 14 September 2026 says the first stage of concreting the reactor-vessel inner cavity was complete, with concreting to finish in winter 2027, and World Nuclear News reported on 7 October 2026, relaying Rosatom, that turbine-hall equipment was being installed with the turbine foundation due by the end of 2026. These are company statements; the earlier 2026 start-up target has not been met. IAEA PRIS names Siberian Chemical Plant JSC as operator and owner. Rosatom put the site's nitride-fuel fabrication module into pilot-industrial operation in December 2024, making mock-up assemblies with depleted uranium; production of uranium-plutonium nitride fuel for the first core awaited regulatory approval to handle plutonium.

Key facts

Design
BREST-OD-300 (SMR)
Technology
Lead-cooled fast reactor (LFR) · lead
Reactor vessel of this design
17.5 m tall, 26 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 277.the section calls the vessel metal-concrete; that names this body and does not add a numeric qualifier The section describes a metal-concrete reactor vessel, not a conventional steel cylinder.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Intended operator(s)
Siberian Chemical Plant JSC (Siberian Chemical Combine)
Vendor for linked design
Rosatom
Location
Seversk BREST-OD-300 site · Russia · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for Seversk unit 1 (BREST-OD-300) in the Siberian Chemical Combine area (CC BY 4.0, derived from GEM's tracker); not a surveyed plot. Replaces an earlier hand-rounded point.
Coordinates
56.6583, 84.9482 · site-area point (approximate)
Electrical capacity
300 MWe (gross) · scope: module
Thermal capacity
700 MWth (nameplate; basis unspecified)
Modules planned
1
Purpose
Power plant
Construction start
8 Jun 2021BREST-OD-300 construction start (IAEA PRIS)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

BREST-OD-300 Seversk is recorded at Seversk BREST-OD-300 site, Tomsk Oblast, Russia. Intended operator: Siberian Chemical Plant JSC (Siberian Chemical Combine). Recorded vendor: Rosatom. Stage: Construction. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'seversk-nuclear-power-plant-1' (56.6583, 84.9482)

Recorded electrical output is 300 MWe (gross), scope module. Modules planned: 1. Recorded thermal output is 700 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Reactor supplier
  • Vendor for the linked designRosatom
Contractor
  • Construction contractorTitan-2 · sourceRUB26.3 billion construction and installation contract (reactor building, turbine hall, infrastructure) awarded by Siberian Chemical Combine in December 2019.
Source-backed project statement

World Nuclear News reported on 5 December 2019 that Siberian Chemical Combine awarded Titan-2 a RUB 26.3 billion contract for construction and installation works on BREST-OD-300, covering the reactor building, turbine hall and related infrastructure. A TVEL release reprinted on 14 September 2026 says Titan-2 has been concreting the reactor vessel's inner cavity, so the awarded contractor is doing the work. Construction is under way, not complete. WNN: Russia awards contract to build BREST reactor; Atomic Energy 2.0 (relaying TVEL/SKhK release): First stage of BREST-OD-300 reactor-vessel concreting completed (14 September 2026)

Funding and government decisions

World Nuclear News' 2019 report gives the value of Siberian Chemical Combine's construction contract with Titan-2, RUB 26.3 billion, which is a contract price, not a funding source. The saved WNN, TVEL and PRIS texts name no funder, budget allocation or financing instrument for BREST-OD-300. WNN: Russia awards contract to build BREST reactor

Fuel
  • Fuel form stated for BREST-OD-300mixed uranium-plutonium mononitride (U-Pu)N
  • Enrichment stated for BREST-OD-300up to 14.5%
Project fuel information is described in the source-backed statement below.
Source-backed project statement

Rosatom's industry media center said on 25 December 2024 that the site's fuel fabrication module had entered pilot-industrial operation, making mock-up BREST-OD-300 assemblies from depleted uranium under a license of 29 March 2024, and that production of mixed uranium-plutonium nitride fuel can begin once the regulator approves plutonium handling. More than 200 such assemblies are needed for the first core. The first core's fuel is therefore to be made on site by Siberian Chemical Combine, with production of the real fuel still awaiting approval in that source. Atom Media (Rosatom press release): Rosatom puts the fuel plant for the BREST-OD-300 reactor into pilot-industrial operation (25 December 2024)

Comparable schedule revision

Source-backed project statement Nuclear Engineering International reported on 19 June 2026 that Rosatom originally planned to launch BREST-OD-300 in 2026 and that, after additional research and development, the launch had been postponed to 2029. World Nuclear News on 7 October 2026 also reports an initial operation target of 2026. The reported launch target changed from 2026 to 2029; launch is not defined as criticality, grid connection or commercial operation. First concrete for BREST turbine - Nuclear Engineering International; World Nuclear News: Key equipment installed in BREST-OD-300 turbine hall (7 October 2026)

Not found in the sources we checked (1): Customer or offtaker
Customer or offtaker

The IAEA PRIS record lists BREST-OD-300 at Seversk as under construction with Siberian Chemical Combine as operator and owner, and World Nuclear News' 7 October 2026 report describes the reactor within the site's closed fuel-cycle complex. Neither names a buyer or supply arrangement for the plant's electricity. IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026; World Nuclear News: Key equipment installed in BREST-OD-300 turbine hall (7 October 2026)

Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Targets

Planned, target and estimated dates are not achievements or commitments.

Dates on the project record: Planned commercial operation: 2028 (target).

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes)

Evidence dates

(4 of 12 sources with a publication or document date)
Latest dated listed source publication: First concrete for BREST turbine - Nuclear Engineering International: 19 Jun 2026.Latest dated listed source document: Atom Media (Rosatom press release): Rosatom puts the fuel plant for the BREST-OD-300 reactor into pilot-industrial operation (25 December 2024): 25 Dec 2024.Latest dated recorded event: Separator-superheaters installed in BREST-OD-300 turbine hall (Rosatom, reported): 7 Oct 2026.8 of 12 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(12)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: BREST-OD-300 Seversk — https://smrmap.com/projects/brest-od-300/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “BREST-OD-300 Seversk”. Record reviewed 18 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/brest-od-300/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.