Companies

SPIC Nuclear Energy Co.

State Power Investment Corporation subsidiary named as owner of the Shandong Haiyang integrated small reactor demonstration project in the regulator's September 2024 siting review opinion.

Projects
Siting: Shandong Haiyang integrated small reactor demonstration project (heat only).
Evidence
2 sources; first primary source: NNSA: site-selection review opinion No. 2414 for the Shandong Haiyang integrated small reactor demonstration project (10 September 2024). Record reviewed 6 Oct 2026.

Key facts

Organization type
Operator
Category
operator
Country
China
Listing status
State-controlled (not independently listed) · source NNSA: site-selection review opinion No. 2414 for the Shandong Haiyang integrated small reactor demonstration project (10 September 2024) · listing checked 6 Nov 2026
Ownership / control
State-controlled
An audit report on 国电投核能有限公司 states that at 31 Dec 2025 it was a wholly owned subsidiary of SPIC Industry-Finance Holdings (SZSE: 000958), with SPIC as final controller. A Sept 2026 rating report names SASAC as the ultimate controller of this SPIC chain.
Record reviewed
6 Oct 2026 (record review date, not proof of current activity)

All fields

(3 without a known value)
Aliases
None recorded in this release
Exchange / ticker
None recorded in this release
Website
None recorded in this release

Linked designs

  • No designs tracked here.

Tracked deployment projects

1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Ownership & relationships

Milestones

Not yet established about this organization

Sources

(2)

Cite or share this page

SMRMap. “SPIC Nuclear Energy Co.”. Record reviewed 6 Oct 2026. https://smrmap.com/companies/spic-nuclear-energy-co/ (accessed [date]).

“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.

Record details
Confidence (as stored in the record)
medium

Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.