Designs / dsn-aalo-1

Aalo-1

Aalo's 2024 NRC engagement plan describes a 10 MWe sodium-cooled thermal-spectrum Aalo-1 reactor. This applicant rating does not specify gross or net output. The Idaho seven-reactor proposal is separate from Aalo-X, a zero-power test assembly, and from the later RELLIS pod concept. The plan does not establish current site commitment or permission.

Class
Microreactor
Technology
Other
Coolant
sodium
Spectrum
thermal
Developer / vendor(s)
Aalo Atomics
Module electrical
10 MWe (nameplate (gross/net unspecified))
Module thermal
—
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-09

Tracked deployment projects

Design sources