Aalo pod (commercial proposal)

Aalo's developer page describes the Aalo Pod as a 50 MWe power plant of five 10 MWe reactors sharing multiple turbines; 10 MWe is recorded as the per-reactor rating, without a gross or net basis, and 50 MWe is the pod total. The pod concept was named in the Texas A&M RELLIS announcement, where the CEO said the company could build up to six pods; a committed count for RELLIS was not stated.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
Siting: Aalo commercial proposal at Texas A&M-RELLIS.
Evidence
2 sources; first primary source: Texas A&M System Goes Nuclear. Record reviewed 1 Oct 2026.

Key facts

Class
SMR
Technology
Other (see description)
Coolant
Sodium
Spectrum
Thermal
Developer / vendor(s)
Aalo Atomics
Module electrical
10 MWe (gross/net unspecified)
Fuel form
UO₂ ceramic
Enrichment
8 % LEU+
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The Texas A&M University System announcement of 4 February 2025 says Aalo Atomics agreed to work with the System on the Energy Proving Ground at Texas A&M-RELLIS and that its CEO said the company could build up to six Aalo Pods there; it gives no output and describes an Early Site Permit application begun by the System, not a construction license. Aalo's current technology page describes the Aalo Pod as a 50 MWe power plant for AI compute with five 10 MWe Aalo-1 reactors sharing multiple turbines, built from factory-manufactured modules, with a sodium thermal reactor type, graphite moderator, liquid sodium coolant and UO2 ceramic fuel at 8% LEU+. The same page's roadmap gives the first commercial pod as construction beginning 2028 (Aalo Pod Q3 2028), a developer target. The 50 MWe figure is a plant total of five reactors, so the per-reactor rating is 10 MWe with no gross or net basis stated. The RELLIS source connects the pod concept to the linked Texas A&M-RELLIS proposal; the developer page names no site for the pod. Stored vendor, sodium coolant, thermal spectrum and fuel stay supported; the empty module rating can be filled with the developer's 10 MWe per reactor. Last checked 19 Oct 2026. Texas A&M System Goes Nuclear; aalo.com: Aalo pod (commercial proposal)
    What would change this

    An Aalo license application or NRC engagement document for a specific Aalo Pod (for example at RELLIS or INL) stating the per-reactor and per-pod ratings with their gross or net basis. Next scheduled check: 19 Jan 2027.

  • Module rating. Aalo's technology page states the Aalo Pod is a 50 MWe plant with five 10 MWe reactors. The per-module (reactor) rating is 10 MWe with no gross or net basis; 50 MWe is the five-reactor plant total and must not be stored as a module rating. No thermal rating is given. Last checked 19 Oct 2026. aalo.com: Aalo pod (commercial proposal)
    What would change this

    An Aalo licensing submission for a pod that states the reactor rating basis (gross or net) and a thermal rating, which would settle the basis now recorded as unspecified. Next scheduled check: 19 Jan 2027.