ABV-6M

OKBM Afrikantov light-water reactor plant of 14 MWt and 6 MWe, which the IAEA's 2014 SMR booklet describes for land-based modular-transportable and floating plants built from large prefabricated modules. Later IAEA editions list OKBM's ABV-6E at the same electrical rating; the booklets do not state whether ABV-6E replaces ABV-6M, so the two profiles stay separate. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA, Advances in Small Modular Reactor Technology Developments (2014 edition). Record reviewed 3 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 2014 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2014
Afrikantov OKBM
Module electrical
6 MWe (gross/net unspecified)
Module thermal
14 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. The 2014 IAEA booklet section ABV-6M, by OKBM Afrikantov, says the installation produces 14 MW(th) or 6 MW(e) in cogeneration mode. It is an integral pressurized-water reactor with natural circulation of the primary coolant, developed from water-cooled, water-moderated power-reactor experience. The stated objective is a small multipurpose source that can be transported, rapidly assembled, and operated for 10 to 12 years without refuelling at a berthing platform or on the coast. Stored 6 MWe and 14 MWth match that pair. The section does not use the word thermal for the spectrum, and it names no deployment site. No later booklet section for ABV-6M was attached. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2014 edition)
    What would change this

    A later OKBM or IAEA booklet section that updates ABV-6M output or distinguishes it from ABV-6E. Next scheduled check: 19 Jan 2027.