Companies

Afrikantov OKBM

The dated NEA and ARIS profiles identify OKBM / Afrikantov OKBM as the reactor designer. This records the named designer, without inferring current ownership or equating it with a parent organization.

Projects
No projects tracked here. 10 designs.
Evidence
7 sources; first primary source: ARIS original status report — ABV-6E (2024-10-17). Record reviewed 2 Oct 2026.

Key facts

Organization type
Reactor developer
Category
vendor
Country
Russia
Listing status
State-controlled (not independently listed) · source Rosatom to 3D-print equipment elements for SMR · listing checked 6 Nov 2026
Ownership / control
State-controlled
World Nuclear News (24 Nov 2025) describes the Afrikantov Experimental Design Bureau of Mechanical Engineering as part of Russia's state nuclear corporation Rosatom; Russian register data via OpenSanctions lists it as a non-public joint-stock company.
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current activity)

All fields

(3 without a known value)
Aliases
None recorded in this release
Exchange / ticker
None recorded in this release
Website
None recorded in this release

Linked designs

(10)
  • RITM-200S — Integral pressurized water reactor (iPWR) · SMR
  • RITM-200M — Integral pressurized water reactor (iPWR) · SMR
  • ABV-6E — Integral pressurized water reactor (iPWR) · SMR
  • GT-MHR — High-temperature gas-cooled reactor (HTGR) · SMR
  • MHR-100 — High-temperature gas-cooled reactor (HTGR) · SMR
  • MHR-T — High-temperature gas-cooled reactor (HTGR) · SMR
  • VBER-300 — Pressurized water reactor (PWR) · SMR
  • RITM-400 — Pressurized water reactor (PWR) · SMR
  • ABV-6M — Integral pressurized water reactor (iPWR) · SMR
  • VBER-150 — Pressurized water reactor (PWR) · SMR

Tracked deployment projects

No project names this organization in a recorded role. The developer table counts the projects that use its designs.

  • No projects tracked here.

Ownership & relationships

Milestones

  • No organization-level milestones recorded.

Organization-level unresolved information

Sources

(7)