ACPR100
CGN design that China's Atomic Energy Authority listed in December 2016 among the country's modular small reactor types (a government publication, not a regulatory decision). Reactor type, coolant and output are not established from that source and are not recorded; distinct from CGN's ACPR50S marine design. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- No projects tracked here. Development status as stated in the source dated 8 Dec 2016: conceptual design completed.
- Evidence
- 2 sources; first primary source: CAEA report on a small modular reactor forum (8 December 2016). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 8 Dec 2016 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Other (see description)
- Developer / vendor(s) as of 8 Dec 2016
- China General Nuclear Power Group
- Development status (as stated)
- conceptual design completed
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(4 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(2)
- CAEA report on a small modular reactor forum (8 December 2016) (government, accessed 3 Oct 2026)
- yznkxjs.xml-journal.net: ACPR100 (peer-reviewed, accessed 14 Oct 2026)
Evidence and open questions
(4 notes)
- Evidence review. A CAEA forum note of 8 December 2016 lists CGN's ACPR100 small reactor separately from the nuclear power institute's ACP25S, ACP100S and ACP100. The list gives no coolant, spectrum or output. The attached journal capture shows the title for a multipurpose small-reactor ACPR100 conceptual design, then site navigation, and the paper body is not in the capture. Stored status says conceptual design completed, while the title supports conceptual design and does not show the word completed. No rating is proposed, and ACPR100 is not treated as marine ACPR50S or as ACP100S. Last checked 19 Oct 2026. CAEA report on a small modular reactor forum (8 December 2016); yznkxjs.xml-journal.net: ACPR100
What would change this
The journal article body, or a CGN design sheet, stating coolant, spectrum and module output for ACPR100. Next scheduled check: 19 Jan 2027.
- Coolant: Not disclosed in the reviewed evidence. The CAEA list names ACPR100 and does not state a coolant. The journal capture has the title and navigation only. Last checked 19 Oct 2026. CAEA report on a small modular reactor forum (8 December 2016); yznkxjs.xml-journal.net: ACPR100
What would change this
The ACPR100 paper body or a CGN specification that names the coolant. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. Neither opened page states a neutron spectrum for ACPR100. Spectrum is not copied from ACP100 or ACPR50S. Last checked 19 Oct 2026. CAEA report on a small modular reactor forum (8 December 2016)
What would change this
A CGN or journal full text that states the ACPR100 neutron spectrum. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. Neither opened page states a megawatt output for ACPR100. No number is added to fill the gap. Last checked 19 Oct 2026. CAEA report on a small modular reactor forum (8 December 2016); yznkxjs.xml-journal.net: ACPR100
What would change this
A CGN specification with ACPR100 module MWe or MWth and its basis. Next scheduled check: 19 Jan 2027.